Boeing: 'Getting Closer' to Assembling First 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jan 13, 2007

Boeing: 'Getting Closer' to Assembling First 787 Dreamliner

Boeing tells ANN that it is showing steady progress toward building the first 787 Dreamliner with the rollout of its second specially-modified freighter and a successful first pickup of 787 parts from Japan.

The load consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries, and section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI. These were loaded onto the 747-400 Large Cargo Freighter -- now known as the Dreamlifter -- earlier today at Centrair Airport in Nagoya. The large composite parts are destined for Charleston, S.C.

"Today is an exciting day for Boeing and our Japanese partners," said Scott Strode, 787 vice president of Airplane Development and Production. "Transporting these parts from FHI and KHI is the first step in assembling the first 787. We're very pleased with how it went and with the quality of the parts received."

In another sign of production readiness, the second Dreamlifter rolled out of the hangar Jan. 7 in Taipei, Taiwan, sporting its distinctive new white and blue livery. The airplane will take its first flight in the next several weeks.

Three Dreamlifters are being modified by Evergreen Aviation Technologies Corporation at its facility at Taiwan Taoyuan International Airport.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC