Boeing: 'Getting Closer' to Assembling First 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Jan 13, 2007

Boeing: 'Getting Closer' to Assembling First 787 Dreamliner

Boeing tells ANN that it is showing steady progress toward building the first 787 Dreamliner with the rollout of its second specially-modified freighter and a successful first pickup of 787 parts from Japan.

The load consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries, and section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI. These were loaded onto the 747-400 Large Cargo Freighter -- now known as the Dreamlifter -- earlier today at Centrair Airport in Nagoya. The large composite parts are destined for Charleston, S.C.

"Today is an exciting day for Boeing and our Japanese partners," said Scott Strode, 787 vice president of Airplane Development and Production. "Transporting these parts from FHI and KHI is the first step in assembling the first 787. We're very pleased with how it went and with the quality of the parts received."

In another sign of production readiness, the second Dreamlifter rolled out of the hangar Jan. 7 in Taipei, Taiwan, sporting its distinctive new white and blue livery. The airplane will take its first flight in the next several weeks.

Three Dreamlifters are being modified by Evergreen Aviation Technologies Corporation at its facility at Taiwan Taoyuan International Airport.

FMI: www.boeing.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC