F-35 Testing Aircraft Comes Full Circle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 13, 2012

F-35 Testing Aircraft Comes Full Circle

Aircraft Used In Static Test Program Returned To LMC In Fort Worth

After successfully completing the static test program on the F-35 (known as AG-1) BAE systems says it has returned the aircraft back to Lockheed Martin. BAE says the static test program broke all records for the speed of testing, having applied more than 150 different loading configurations in just over nine months. Now, after proving the strength of the aircraft, it is beginning the 4500 mile journey back to the U.S. after almost three and a half years in the structural test facility at Brough in the UK.

Static testing the F-35 means that the aircraft has been ‘flown’ to its limits with loads applied to it replicating the effect of high gravitational forces far beyond any conditions likely to be flown in actual flight.  This is done with the airframe nesting in a multi-million pound rig fitted with over 4000 strain gauges, 170 actuators and over 50 miles of wiring at our Brough site in Yorkshire. Brough is home to a facility well known for putting aircraft through their paces to ensure they are strong enough and resilient enough to perform in the harshest environments in the world.
 
“We certainly don’t give the aircraft an easy ride here," said Tim Bramhall, F-35 structural test program manager at Brough. "We push it to its limits so that we can be confident that each of the 3000+ aircraft that have been ordered will perform safely and effectively. The real challenge is keeping aircraft weight at a minimum while maintaining the strength of the plane within certain specified limits”   
 
“We still have another F-35 CTOL airframe in the facility undergoing fatigue testing along with the remaining "horizontal and vertical tails from the Carrier variant," Bramhall continued. Work on those continues on schedule and are shining examples of the long term future the structural test facility has ahead.”

FMI: www.baesystems.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC