AD: Dassault Aviation Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Feb 18, 2020

AD: Dassault Aviation Airplanes

AD NUMBER: 2020-02-21

PRODUCT: All Dassault Aviation Model FALCON 2000 airplanes.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2018-19-25 and AD 2014-03- 12, which applied to all Dassault Aviation Model FALCON 2000 airplanes.

Those ADs required revising the existing maintenance or inspection program, as applicable, to incorporate new maintenance requirements and airworthiness limitations. Since the FAA issued AD 2018-19-25, the FAA has determined that new or more restrictive airworthiness limitations are necessary.

This AD continues to require those maintenance or inspection program revisions, and also requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations.

This AD was prompted by a determination that new or more restrictive airworthiness limitations are necessary.

DATES: This AD is effective March 18, 2020.

COST:

The FAA estimates that this AD affects 200 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA estimates the total cost per operator for the retained actions from AD 2018-19-25 to be $7,650 (90 work-hours x $85 per work-hour).

The FAA has determined that revising the maintenance or inspection program takes an average of 90 work-hours per operator, although the FAA recognizes that this number may vary from operator to operator. In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (04.17.24)

"Sometimes, growth makes it easy to miss the little things, and today's "little guy" is smarting more than ever just looking at the price tags of "cheap" aircraft. Poberezny, seein>[...]

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

Airborne 04.11.24: SnF24!, King's 50th, Top Rudder, Aileronics

Also: Flight Club, Jet Shades, MyGoFlight’s FlightFlix Acquisition FIFTY YEARS! What a milestone for the aviation world’s master aero-education duo! John, Martha, along>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC