NASA/SpaceX Crew-1 Manned Flight Experiences 'Cautionary' Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Sun, Oct 11, 2020

NASA/SpaceX Crew-1 Manned Flight Experiences 'Cautionary' Delay

Will Evaluate Recent Off-Nominal Behavior Of Falcon 9 First Stage Engine Gas Generators

Launch of NASA’s SpaceX Crew-1 mission to the International Space Station is now targeted for no sooner than early-to-mid November, providing additional time for SpaceX to complete hardware testing and data reviews as the company evaluates off-nominal behavior of Falcon 9 first stage engine gas generators observed during a recent non-NASA mission launch attempt.

Through the agency’s Commercial Crew and Launch Services Programs partnership with SpaceX, NASA has full insight into the company’s launch and testing data.

“We have a strong working relationship with our SpaceX partner,” said Kathy Lueders, associate administrator of NASA’s Human Exploration and Operations Mission Directorate. “With the high cadence of missions SpaceX performs, it really gives us incredible insight into this commercial system and helps us make informed decisions about the status of our missions. The teams are actively working this finding on the engines, and we should be a lot smarter within the coming week.”

Additional upcoming NASA missions rely on the Falcon 9 for launch. The Sentinel-6 Michael Freilich launch still is targeted for Tuesday, Nov. 10, from Vandenberg Air Force Base in California, and NASA’s SpaceX CRS-21, is targeted for launch in late November or early December, from Cape Canaveral Air Force Station in Florida. NASA and SpaceX will use the data from the company’s hardware testing and reviews to ensure these critical missions are carried out with the highest level of safety.

NASA’s SpaceX Crew-1 mission will launch NASA astronauts Michael Hopkins, Victor Glover, and Shannon Walker, along with Japan Aerospace Exploration Agency (JAXA) mission specialist Soichi Noguchi, from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The Crew Dragon spacecraft, named Resilience by the Crew-1 astronauts, was secured to its unpressurized trunk on Friday, Oct. 2, at the company’s processing facility on Cape Canaveral.

After launch, Crew Dragon will perform a series of maneuvers culminating with rendezvous and docking with the International Space Station. That milestone will mark the Crew-1 astronauts’ integration with the Expedition 64 astronauts Kate Rubins, as well as Expedition 64 commander Sergey Ryzhikov and flight engineer Sergey Kud-Sverchkov, both of the Russian space agency Roscosmos.

During their stay on the orbiting laboratory, astronauts of Crew-1 will see a range of unpiloted spacecraft including the Northrop Grumman Cygnus, the next generation of SpaceX cargo Dragon spacecraft, and the Boeing CST-100 Starliner on its uncrewed flight test to the station. They also will conduct a variety of spacewalks and welcome crews of the Russian Soyuz vehicle and the next SpaceX Crew Dragon in 2021.

At the conclusion of the mission, Crew Dragon will autonomously undock with the four astronauts on board, depart the space station and re-enter the Earth’s atmosphere. After splashdown just off Florida’s coast, the crew will be picked up at sea by a SpaceX recovery vessel and will be brought to shore to board a plane for return to the Johnson Space Center in Houston.

The Crew-1 mission is a major step for NASA’s Commercial Crew Program. Operational, long duration commercial crew rotation missions will enable NASA to continue the important research and technology investigations taking place onboard the station. Such research benefits people on Earth and lays the groundwork for future exploration of the Moon and Mars starting with the agency’s Artemis program, which will land the first woman and the next man on the lunar surface in 2024.

FMI: www.nasa.gov, www.spacex.com

Advertisement

More News

Aero-News: Quote of the Day (10.16.25)

“This integration marks a significant step forward in cockpit connectivity and safety. It is one of few solutions offered to business aviation and rotorcraft operators that p>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

ANN's Daily Aero-Term (10.16.25): Enhanced Flight Vision System (EFVS)

Enhanced Flight Vision System (EFVS) An EFVS is an installed aircraft system which uses an electronic means to provide a display of the forward external scene topography (the natur>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Unveils 50 Amp-hour Lithium-ion, Main Ship Battery >[...]

NTSB Final Report: Bellanca 17-30A

Shortly After Takeoff, The Engine Completely Lost Power Analysis: The pilot reported that the engine start, run-up, and takeoff were without incident. However, shortly after takeof>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC