NASA/SpaceX Crew-1 Manned Flight Experiences 'Cautionary' Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned-
Alt. Wednesdays

Airborne Flight Training-Alt. Wednesdays

Airborne Unlimited-
Friday

Airborne Special Programs!
Airborne-YouTube Airborne Unlimited--10.19.20 Airborne-Unmanned--10.14.20   Airborne-Flight Training--10.21.20 Airborne Unlimited--10.16.20  The 2020 Avionics Innovation Preview!

Airborne On ANN

Airborne Unlimited--10.19.20

Airborne-Unmanned--10.14.20

Airborne-Flight Training--10.21.20

Airborne Unlimited--10.16.20

Airborne's Annual April 1st Episode

Sun, Oct 11, 2020

NASA/SpaceX Crew-1 Manned Flight Experiences 'Cautionary' Delay

Will Evaluate Recent Off-Nominal Behavior Of Falcon 9 First Stage Engine Gas Generators

Launch of NASA’s SpaceX Crew-1 mission to the International Space Station is now targeted for no sooner than early-to-mid November, providing additional time for SpaceX to complete hardware testing and data reviews as the company evaluates off-nominal behavior of Falcon 9 first stage engine gas generators observed during a recent non-NASA mission launch attempt.

Through the agency’s Commercial Crew and Launch Services Programs partnership with SpaceX, NASA has full insight into the company’s launch and testing data.

“We have a strong working relationship with our SpaceX partner,” said Kathy Lueders, associate administrator of NASA’s Human Exploration and Operations Mission Directorate. “With the high cadence of missions SpaceX performs, it really gives us incredible insight into this commercial system and helps us make informed decisions about the status of our missions. The teams are actively working this finding on the engines, and we should be a lot smarter within the coming week.”

Additional upcoming NASA missions rely on the Falcon 9 for launch. The Sentinel-6 Michael Freilich launch still is targeted for Tuesday, Nov. 10, from Vandenberg Air Force Base in California, and NASA’s SpaceX CRS-21, is targeted for launch in late November or early December, from Cape Canaveral Air Force Station in Florida. NASA and SpaceX will use the data from the company’s hardware testing and reviews to ensure these critical missions are carried out with the highest level of safety.

NASA’s SpaceX Crew-1 mission will launch NASA astronauts Michael Hopkins, Victor Glover, and Shannon Walker, along with Japan Aerospace Exploration Agency (JAXA) mission specialist Soichi Noguchi, from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The Crew Dragon spacecraft, named Resilience by the Crew-1 astronauts, was secured to its unpressurized trunk on Friday, Oct. 2, at the company’s processing facility on Cape Canaveral.

After launch, Crew Dragon will perform a series of maneuvers culminating with rendezvous and docking with the International Space Station. That milestone will mark the Crew-1 astronauts’ integration with the Expedition 64 astronauts Kate Rubins, as well as Expedition 64 commander Sergey Ryzhikov and flight engineer Sergey Kud-Sverchkov, both of the Russian space agency Roscosmos.

During their stay on the orbiting laboratory, astronauts of Crew-1 will see a range of unpiloted spacecraft including the Northrop Grumman Cygnus, the next generation of SpaceX cargo Dragon spacecraft, and the Boeing CST-100 Starliner on its uncrewed flight test to the station. They also will conduct a variety of spacewalks and welcome crews of the Russian Soyuz vehicle and the next SpaceX Crew Dragon in 2021.

At the conclusion of the mission, Crew Dragon will autonomously undock with the four astronauts on board, depart the space station and re-enter the Earth’s atmosphere. After splashdown just off Florida’s coast, the crew will be picked up at sea by a SpaceX recovery vessel and will be brought to shore to board a plane for return to the Johnson Space Center in Houston.

The Crew-1 mission is a major step for NASA’s Commercial Crew Program. Operational, long duration commercial crew rotation missions will enable NASA to continue the important research and technology investigations taking place onboard the station. Such research benefits people on Earth and lays the groundwork for future exploration of the Moon and Mars starting with the agency’s Artemis program, which will land the first woman and the next man on the lunar surface in 2024.

FMI: www.nasa.gov, www.spacex.com

Advertisement

More News

Klyde Morris (10.19.20)

Aw... Heck No! Klyde Has Jetpack Fever! FMI: www.klydemorris.com>[...]

Aero-News: Quote of the Day (10.19.20)

1) China Airlines 006: “We just saw a bright object at 6,000.” 2) LAX Tower: “006 heavy can you say that one more time please?” 3) China Airlines 006: &ldqu>[...]

Airborne 10.19.20: Raptor 1st Flt, P92 Echo MkII, Jetpacks v LAX

Also: 'Top Gun' Pays Off, Edwards AFB, 'Women in the Air Force', FAA Proposes $464,300 Penalty We have a packed episode today filled with the latest news, let's start with a video >[...]

ANN's Daily Aero-Linx (10.20.20)

Aero Linx: The Granite State Balloon Association The Granite State Balloon Association is a group of pilots, crew, and families dedicated to making ballooning a safe, fun sport in >[...]

Aero-News: Quote of the Day (10.20.20)

“The OSIRIS-REx spacecraft will make its first TAG attempt at gathering at least 2 ounces regolith from the asteroid Bennu. Since Bennu is so far away, the operators on the g>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC