Boeing Reveals Ups and Downs of 2Q/21 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jul 14, 2021

Boeing Reveals Ups and Downs of 2Q/21

Second-Quarter Deliveries Discussed, 787 Program Updated

Boeing announced major program deliveries across its commercial and defense operations for the second quarter of 2021.

"We continue the work to deliver on our commitments to our commercial, defense, space and services customers, while positioning our business for a stable and strong recovery from the pandemic. In the second quarter, we made progress in safely returning the 737 MAX to service in more international markets and increasing the pace of 737 deliveries," the company said.

As Boeing has previously shared, the company has been engaged in detailed discussions with the FAA on verification methodology for 787 fuselages, and conducting associated inspections and rework. In connection with these efforts, the company has identified additional rework that will be required on undelivered 787s. Based on our assessment of the time required to complete this work, Boeing is reprioritizing production resources for a few weeks to support the inspection and rework. As that work is performed, the 787 production rate will temporarily be lower than five per month and will gradually return to that rate. Boeing now expects to deliver fewer than half of the 787s currently in inventory this year.

"We will continue to take the necessary time to ensure Boeing airplanes meet the highest quality prior to delivery. Across the enterprise, our teams remain focused on safety and integrity as we drive stability, first-time quality and productivity in our operations," the company added.

Major program deliveries during the second quarter were as follows:

Major Programs

2nd Quarter
2021

Year-to-
Date 2021

Commercial Airplanes Programs

737

50

113

747

1

2

767

8

13

777

8

14

787

12

14

Total

79

156

   

Defense, Space & Security Programs

AH-64 Apache (New)

6

15

AH-64 Apache (Remanufactured)

16

31

CH-47 Chinook (New)

3

6

CH-47 Chinook (Renewed)

1

4

F-15 Models

5

8

F/A-18 Models

7

11

KC-46 Tanker

2

4

P-8 Models

3

6

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC