NASA Commercial Crew Partner Boeing Completes Launch Vehicle Adapter Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.26.15

Airborne 05.27.15

Airborne 05.21.15

Airborne 05.22.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.26.15

Airborne 05.27.15

Airborne 05.21.15

Airborne 05.22.15

 

Tue, Apr 09, 2013

NASA Commercial Crew Partner Boeing Completes Launch Vehicle Adapter Review

Designed To Connect Crew Capsule To The Booster

NASA Commercial Crew Program (CCP) partner Boeing has successfully completed a preliminary design review (PDR) of the component that would connect the company's new crew capsule to its rocket. The review is one of six performance milestones Boeing has completed for NASA's Commercial Crew Integrated Capability (CCiCap) initiative, which is intended to make available commercial human spaceflight services for government and commercial customers. The company is on track to complete all 19 of its milestones during CCiCap.

Boeing is one of three U.S. companies NASA is working with during CCiCap to set the stage for a crewed orbital demonstration mission around the middle of the decade. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station. The component that was reviewed is called the Launch Vehicle Adapter. The critical structure is being designed by United Launch Alliance (ULA) to join Boeing's Crew Space Transportation-100 (CST-100) (pictured in artist's rendering) spacecraft to ULA's Atlas V rocket, just above the rocket's second stage. "Solid systems engineering integration is critical to the design of a safe system," said Ed Mango, NASA's CCP manager. "Boeing and all of NASA's partner companies are working to build in proper systems integration into their designs. This review with Boeing and their partner ULA was a good review of the current state of these important design interfaces."

In recent weeks, teams from NASA, Boeing and ULA met at ULA's headquarters in Denver, CO, to assess requirements and capabilities to safely launch people into low-Earth orbit from U.S. soil once again. The PDR was a culmination of early development and preliminary analysis to demonstrate the design is ready to proceed with detailed engineering. "The PDR was an outstanding integrated effort by the Boeing, ULA and NASA teams," said John Mulholland, vice president and program manager of Boeing Commercial Programs. "The ULA design leverages the heritage hardware of the Atlas V to integrate with the CST-100, setting the baseline for us to proceed to wind tunnel testing and the Launch Segment-level PDR in June."

In addition to the Launch Vehicle Adapter PDR, Boeing recently completed two additional CCiCap milestones, including the Engineering Release (ER) 2.0 software release and the Landing and Recovery Ground Systems and Ground Communications design review. The ER 2.0 software release was completed Jan. 25 in Boeing's Avionics and Software Integration Facility Lab in Houston. This test laid the foundation for the software structure to control and fly the spacecraft, as well as communicate with pilots and ground systems.

The landing and recovery ground systems and ground communications design review Jan. 16 to 18 in Titusville, FL, established the baseline plan for equipment and infrastructure needed for CST-100 spacecraft ground communications and landing and recovery operations.

FMI: www.nasa.gov/commercialcrew

Advertisement

More News

Airborne 05.27.15: Did Boeing Over-Promise?, Anti-KSMO Chicanery, Jimmy Stewart

Also: FAA Hiring Astray?, Comparison Shopping LSAs, Philippines Flying Limitations, Asteroid Redirect, Wings Of Mercy, Student Launch Challenge, Alaska Air In 2013, the State of Wa>[...]

AeroSports Update: LadiesLoveTaildraggers Fly-in Canceled

Bad Weather Hammers Sulfur Springs Texas Airport And The Ladies Who Love Taildraggers Shut Down Their May 29-31 Fly-in Just in case you haven’t been watching the news, the Mi>[...]

ANN's Daily Aero-Linx (05.28.15)

Lessons Learned From Transport Airplane Accidents This Lessons Learned From Transport Airplane Accidents library represents some of the most major accidents and their related lesso>[...]

ANN's Daily Aero-Term (05.28.15): Nautical Mile

A unit of distance used in aviation and marine navigation and marine forecasts.>[...]

Aero-News: Quote Of The Day (05.28.15)

“As a pilot, your first job is to fly your own airplane. Part of that job is to scan for other airplanes.” Source: NTSB Chair Christopher Hart.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC