Raytheon Successfully Demonstrates Airborne Electronic Attack System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 23, 2014

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities

The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electronic attack system during flight tests at the Naval Air Weapons Station China Lake in October.

"Eight months after award of the NGJ program we successfully flew the integrated prototype system against representative threat radars," said Travis Slocumb, vice president of Electronic Warfare Systems at Raytheon's Space and Airborne Systems business.  "This demonstrates the capability and readiness of the core enabling technologies for the next generation of EW systems, and we did it on our first flight."

The advanced, first of its kind system consisted of an active electronically scanned array (AESA), an all-digital, open, scalable receiver and techniques generator and a self-powered pod mounted on the underside of a Gulfstream business jet.  The high power AESA front end and multichannel techniques generator are common building blocks not just for the U.S. Navy's Next Generation Jammer, but also for other airborne, maritime and ground-based EW systems.

A team of engineering and technical personnel collected and evaluated test data confirming the successful jamming and disruption of air defense radars, which were representative of enemy threat radars. The combination of jamming techniques, beam agility, array-transmit power and jammer management were very effective against the threat systems and all test objectives were met or exceeded.

A primary goal of the flight test activity, based at Naval Air Station Point Mugu, was to reduce risk in the engineering, manufacturing and development (EMD) phase of the Next Generation Jammer acquisition by the U.S. Navy. While all the elements had been previously tested in a lab setting, this was the first time the end-to-end system had been powered by the air stream.

(Image provided by Raytheon)

FMI: www.raytheon.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC