Raytheon Successfully Demonstrates Airborne Electronic Attack System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 23, 2014

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities

The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electronic attack system during flight tests at the Naval Air Weapons Station China Lake in October.

"Eight months after award of the NGJ program we successfully flew the integrated prototype system against representative threat radars," said Travis Slocumb, vice president of Electronic Warfare Systems at Raytheon's Space and Airborne Systems business.  "This demonstrates the capability and readiness of the core enabling technologies for the next generation of EW systems, and we did it on our first flight."

The advanced, first of its kind system consisted of an active electronically scanned array (AESA), an all-digital, open, scalable receiver and techniques generator and a self-powered pod mounted on the underside of a Gulfstream business jet.  The high power AESA front end and multichannel techniques generator are common building blocks not just for the U.S. Navy's Next Generation Jammer, but also for other airborne, maritime and ground-based EW systems.

A team of engineering and technical personnel collected and evaluated test data confirming the successful jamming and disruption of air defense radars, which were representative of enemy threat radars. The combination of jamming techniques, beam agility, array-transmit power and jammer management were very effective against the threat systems and all test objectives were met or exceeded.

A primary goal of the flight test activity, based at Naval Air Station Point Mugu, was to reduce risk in the engineering, manufacturing and development (EMD) phase of the Next Generation Jammer acquisition by the U.S. Navy. While all the elements had been previously tested in a lab setting, this was the first time the end-to-end system had been powered by the air stream.

(Image provided by Raytheon)

FMI: www.raytheon.com, www.navy.mil

Advertisement

More News

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames On The Right Side Of The Airplane Analysis: The pilot reported that about 30 minutes in>[...]

ANN's Daily Aero-Term (11.22.25): Remote Communications Outlet (RCO)

Remote Communications Outlet (RCO) An unmanned communications facility remotely controlled by air traffic personnel. RCOs serve FSSs. Remote Transmitter/Receivers (RTR) serve termi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC