Boeing 777X Fuselage Failed During Stress Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned

Airborne Unlimited-Wednesday Airborne Flight Training

Airborne Unlimited-
Friday

Airborne-ANN Airborne Unlimited--01.11.21 Airborne-Unmanned--01.12.20 Airborne Unlimited--01.13.21 Airborne-Flight Training--01.14.20 Airborne Unlimited--01.15.21

Airborne On YouTube

Airborne Unlimited--01.11.21

Airborne-Unmanned--01.12.20

Airborne Unlimited--01.13.21 Airborne-Flight Training--01.14.20

Airborne Unlimited--01.15.21

Mon, Dec 02, 2019

Boeing 777X Fuselage Failed During Stress Test

Did Not Meet Parameters Necessary For Certification

The fuselage of Boeing's 777X test article failed "explosively" during an extreme test of its structural strength.

The Seattle Times reports that the incident occurred in September. The fuselage failed just as the test approached the stress level necessary for certification, but missed by just one percent.

While Boeing has kept exact details of the failure secret, the paper was able to obtain photos which show very extensive damage to the test airframe. The fuselage skin ripped apart just behind the wing, and a passenger door blew out and fell to the factory floor, according to the report.

With the failure coming so close to the federal requirement, Boeing may not have to build a new test article and retest the fuselage. The paper reports that the FAA will likely accept analysis that indicates that it will be sufficient to reinforce the fuselage in the area where the failure occurred.

Boeing said in a statement to the paper that a full analysis of the failure has not yet been completed, but that the company does not believe that it will have a "significant impact on the design or our preparations for first flight."

The program has already been delayed due to problems with the GE9X engine developed for the new airliner, and Boeing said that this stress test failure should not add to those delays. Boeing spokesman Paul Bergman said the company still anticipates the 777X will fly for the first time in early 2020, and the first customer deliveries should happen in 2021.

(Image from file)

FMI: Source report

Advertisement

More News

Airborne 01.15.21: DeLand FtH Cancelled, Blue Origin Flt, FAA SkyPolicing

Also: Alaska Airlines 737 MAX, Super Bowl LV, COVID-19 Test Requirement, Atlas' Last 747-8s ANN received official confirmation that COVID concerns have again halted a sport aviatio>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Airborne 01.11.21: SecTrans Quits, Feds Quit, Boeing Pays $$$, UK Restricts GA

Also: NTSB Says CFIs Need More Scrutiny, USAF Thunderbirds, Bell 505, Amazon Buys Boeings Shortly after the resignation of DoT Secretary Elaine Chao, FAA chief of staff Angela Stub>[...]

Aero-News: Quote of the Day (01.14.21)

“Testing does not eliminate all risk, but when combined with a period of staying at home and everyday precautions like wearing masks and social distancing, it can make travel>[...]

ANN's Daily Aero-Term (01.14.21): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth’s surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clut>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2021 Web Development & Design by Pauli Systems, LC