NASA: T-Minus One Year Until First Ares Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Airborne-YouTube

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Mon, Apr 14, 2008

NASA: T-Minus One Year Until First Ares Flight

366 Days And Counting Until Blastoff

Mark your calendars for April 15, 2009. Not so you might get a head start now on filing your taxes next year (as opposed to the last-minute cramming many of us are now suffering through) but instead so you may count down with NASA to the first scheduled flight of its next booster rocket, the Ares 1.

Florida Today reports engineers with the space agency are already working overtime to ensure the 327-foot tall Ares 1-X will have a smooth flight from Pad 39B at Kennedy Space Center. In fact, many expect the time remaining will "fly" by.

"You're going to blink your eyes and it's going to be gone," KSC's Ares 1-X project manager Carol Scott said. "I don't think I've ever been involved with a project that has moved this fast."

"We've got a lot to do, and a very short time to do it," added NASA lead Ares 1-X ground systems engineer Jon Cowart.

The April 2009 flight will be the first of four test fights for the rocket's first stage, derived from the current space shuttle's solid-rocket boosters. In particular, NASA hopes the flight will validate measures it is now undertaking to quell an anticipated vibration issue in the booster system, which could pose problems down the line for the survivability of later variants of the rocket.

The flight will also demonstrate the abilities of the first-stage flight control systems to keep the "single stick" rocket on course, without the benefit of control fin surfaces.

For the first test flight, NASA will use a four-segment booster, topped with an empty fifth segment. Replicas of an Ares 1 second stage, Orion space capsule and launch abort system rocket will ride up top. The dummy segments will feature correct exterior detailing for aerodynamics testing, and will weigh about the same as their real-life counterparts.

"It's made to look a lot like the Ares 1 vehicle, but it's a very different animal," said NASA lead ground operations engineer Tassos Abadiotakis. "We're also going to get some aerodynamics data, some thermal data -- just the basic rocketry laws to make sure what we're proposing to go fly for Ares 1 actually is going to perform as advertised."

Scott calls the Ares 1 "a long, skinny rocket. Some folks compare it to a noodle, so we want to make sure that we are able to have the flight control in place to go fly it properly.

"This is just an incredible opportunity -- to be able to get the program going and being the pathfinder for it," Scott added. "I'm really excited."

The year ahead will also provide ground operations and launch crews time to perfect the processes they expect to use when the Ares isn't just flying on test missions... but carrying astronauts back to the moon.

"I'm way too busy to have butterflies," Cowart said. "We're going to go do this, and we're going to make it."

FMI: www.nasa.gov

Advertisement

More News

Airborne-Unmanned 03.21.17: Heron 1 FOC, Canadian UAVs BVLOS, Quad Inspects C17

Also: Terra Drone, senseFly partners with MicaSense, Quadcopter Topology Optimization The Heron 1 UAV has attained Full Operational Capability (FOC), allowing two Republic of Singa>[...]

AMA Drone Report 03.23.17: New Canada Drone Regs, 'Anti-Drone' Race, Tiny Whoop

Also: SELFLY Camera-Kickstarter, Turtle Tracking Drones, Drones Save Lives! The Canadian government has recently released new regulations for recreational drone operators that carr>[...]

Airborne 03.24.17: GA v Privatization, FAA UAS $$$, Mexico Fines

Also: NASA Authorization, Av-Associations, Essential Air Services, Kite String, Rotax @SnF, Car v Plane, FAA Forecast With the need to authorize the FAA before September 30 of this>[...]

Airborne 03.23.17: Citation Longitude Update, Lawn-Chair Balloonacy, Yuneec

Also: Sea Vixen, FAA-UAS Symposium, Boeing Layoffs, Evada Aircraft, OneWeb, Legacy 450, MS A/C Sale The third aircraft in the Cessna Citation Longitude flight test program recently>[...]

Airborne 03.24.17: GA v Privatization, FAA UAS $$$, Mexico Fines

Also: NASA Authorization, Av-Associations, Essential Air Services, Kite String, Rotax @SnF, Car v Plane, FAA Forecast With the need to authorize the FAA before September 30 of this>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC