AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned-
Alt. Wednesdays

Airborne Flight Training-Alt. Wednesdays

Airborne Unlimited-
Friday

Airborne Special Programs!

Airborne On ANN

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.20.20

Airborne Unlimited--05.29.20

Airborne's Annual April 1st Episode

Airborne-YouTube

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.20.20

Airborne Unlimited--05.29.20

The 2020 Avionics Innovation Preview!

Tue, Jun 12, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-11-12

PRODUCT: All Bombardier, Inc., Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes, Model CL-600-2D15 (Regional Jet Series 705) airplanes, Model CL-600-2D24 (Regional Jet Series 900) airplanes, and Model CL-600- 2E25 (Regional Jet Series 1000) airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a report that Belleville washers installed on the shimmy damper of the main landing gear (MLG) may fail due to fatigue.

This AD requires revising the maintenance or inspection program, as applicable, to incorporate a repetitive task specified in the maintenance review board (MRB) report.

DATES: This AD is effective July 12, 2018.

COST: The FAA estimates that this AD affects 544 airplanes of U.S. registry.

The FAA has determined that revising the maintenance or inspection program takes an average of 90 work-hours per operator, although we recognize that this number may vary from operator to operator.

In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. Therefore the total cost per operator to be $7,650 (90 work-hours x $85 per work-hour).

FMI: AD

Advertisement

More News

NASA and SpaceX Maintain Target For May 30 Demo-2 Launch

NASA Continues to Monitor Weather, Cross Fingers, Keep Rabbit's Foot Close By... NASA and SpaceX continue planning toward a Saturday, May 30, launch attempt of NASA’s SpaceX >[...]

Congo Airways Converts Embraer E175 Order to E190-E2 Jets

Currently 189 Embraer Aircraft Operating In Africa Congo Airways have converted the firm order made in December 2019 for two E175 aircraft, with purchase rights for two more, into >[...]

EAA Advises EPA Against Need for Evaluation or Regulation of Avgas Component

EAA Made Clear That The Public Has Limited To No Exposure To EDB In Concentrated Form EAA recommended the EPA not designate an integral component of avgas, ethylene dibromide (EDB)>[...]

EHang Granted Approval To Use EHang 216 Passenger-Grade Aav For Air Logistics Pu

Trial Air Logistics Services Using the EHang 216 Starting Soon EHang has obtained the world’s first commercial pilot operation approval to use passenger-grade autonomous aeri>[...]

Pulselite Bird Strike Prevention System STC Expanded to Include Bell 429 and 505

Pulselite System Has Been Proven To Significantly Reduce Bird Strikes Precise Flight has expanded its Supplemental Type Certificate (STC) from the FAA for the Pulselite Bird Strike>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC