Boeing Avoids DoJ Prosecution, But Pays $2.5B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jan 09, 2021

Boeing Avoids DoJ Prosecution, But Pays $2.5B

Reaches Conditional Agreement with Department of Justice

Boeing has avoided criminal prosecution as a result of its many perceived and real failings in the wake of the 737 Max tragedy.

Boeing has entered into an agreement with the Department of Justice, which resolves the Department’s investigation into the Company relating to the evaluation of the Boeing 737 MAX airplane by the FAA. As part of Boeing’s resolution with DOJ, the Department has agreed to defer prosecution of the company, provided that Boeing abides by the obligations set forth in a three-year deferred prosecution agreement, after which time the charge will be dismissed.

Under the agreement, Boeing will pay a penalty of $243.6 million and provide $500 million in additional compensation to the families of those lost in the Lion Air and Ethiopian Airlines accidents. The agreement also includes a commitment to provide $1.77 billion to Boeing’s airline customers as part of the Company’s ongoing efforts to compensate those customers for financial losses resulting from the grounding of the 737 MAX.

The agreement is based on the conduct of two former Boeing employees and their intentional failure to inform the FAA Aircraft Evaluation Group (AEG), the group within the FAA responsible for making pilot training determinations, about changes to the Maneuvering Characteristics Augmentation System (MCAS).

As a result of this conduct, the agreement states that the FAA AEG was not fully informed about MCAS’s expanded operating range when it made its training determinations for the MAX. While focusing on the conduct of these two former employees, the agreement recognizes that other Boeing employees did inform other officials and organizations within the FAA about MCAS’s expanded operating range in connection with the certification of the 737 MAX.

David L. Calhoun, Boeing President and Chief Executive Officer, said in a note to employees: “I firmly believe that entering into this resolution is the right thing for us to do—a step that appropriately acknowledges how we fell short of our values and expectations. This resolution is a serious reminder to all of us of how critical our obligation of transparency to regulators is, and the consequences that our company can face if any one of us falls short of those expectations.”

Boeing’s announcement of the agreement was accompanied by an 8-K filing with the Securities and Exchange Commission, which reflected that the Company had taken a $743.6 million charge to earnings in connection with its commitments under the agreement.

FMI: www.justice.gov, www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC