FAA Prepares AD For Boeing 737 Leading Edge Slats | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Tue, Jun 04, 2019

FAA Prepares AD For Boeing 737 Leading Edge Slats

Company Informs The Agency That Some Slat Tracks May Have Been Improperly Manufactured

Boeing has informed the FAA that certain 737NG and 737MAX leading edge slat tracks may have been improperly manufactured and may not meet all applicable regulatory requirements for strength and durability.

Following an investigation conducted by Boeing and the FAA Certificate Management Office (CMO), the FAA has determined that up to 148 parts manufactured by a Boeing sub-tier supplier are affected. Boeing has identified groups of both 737NG and 737MAX airplane serial numbers on which these suspect parts may have been installed. 32 NG and 33 MAX are affected in the U.S. Affected worldwide fleet are 133 NG and 179 MAX aircraft.

The affected parts may be susceptible to premature failure or cracks resulting from the improper manufacturing process. Although a complete failure of a leading edge slat track would not result in the loss of the aircraft, a risk remains that a failed part could lead to aircraft damage in fight.

According to Boeing, Slat tracks are used to guide the slats located on the leading edge of an airplane’s wings. Boeing has not been informed of any in-service issues related to this batch of slat tracks.

Boeing is now staging replacement parts at customer bases to help minimize aircraft downtime while the work is completed. Once the new parts are in hand, the replacement work should take one to two days. Boeing will also issue a safety service bulletin outlining the steps to take during the inspections.

The FAA will issue an Airworthiness Directive to mandate Boeing's service actions to identify and remove the discrepant parts from service. Operators of affected aircraft are required to perform this action within 10 days. The FAA today also alerted international civil aviation authorities of this condition and required actions.

(Source: FAA and Boeing news releases. Image from file)

FMI: www.faa.gov
www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: The International Civil Aviation Organization (ICAO) The International Civil Aviation Organization (ICAO) is a United Nations agency which helps 193 countries to coopera>[...]

NTSB Final Report: Champion 7GC

About 25 Days (9.3 Hours) Before The Accident, The Airframe Was Modified With Different Landing Gear Legs, Wheels, And Brakes Analysis: The pilot reported that during the landing r>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Aero-News: Quote of the Day (11.06.25)

“Over 2025, Vertical has shown that when we set targets, we deliver. Whilst maintaining our industry-leading capital efficiency, we are not only demonstrating all piloted fli>[...]

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: Air Medical Physician Association (AMPA) The Air Medical Physician Association (AMPA) is the largest professional organization of physicians dedicated to rotor wing (hel>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC