FAA Delays UAV Testing Site Selection 'Indefinitely' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited--02.24.20

Airborne UnManned--
02.18.20

Airborne Unlimited--02.19.20

AMA Drone Report--02.20.20

Airborne Unlimited--02.21.20

Airborne-YouTube

Airborne Unlimited--02.24.20

Airborne UnManned--
02.18.20

Airborne Unlimited--02.19.20

AMA Drone Report--02.20.20

Airborne Unlimited--02.21.20

Thu, Nov 22, 2012

FAA Delays UAV Testing Site Selection 'Indefinitely'

Huerta Cites Safety, Privacy Concerns In Letter To UAV Caucus

The FAA has again delayed the site selection for flight testing of UAVs that would eventually lead to their integration into the NAS. Acting Administrator Michael Huerta sent a letter last week to the Congressional UAV Caucus indicating that there were still safety and privacy issues to be resolved.

The deadline for the FAA to select the six sites intended for flight testing was December, but in the letter, which was addressed to caucus chairman Rep. Howard McKeon (R-CA) Huerta said that establishment of the sites has been "suspended" with no new deadline set.

The advocacy group UAS Vision reports on their website that, in the letter, Huetra said that "Our target was to have six test sites by the end of 2012. However, increasing the use of UAS in our airspace also raises privacy issues, and these issues will need to be addressed as unmanned aircraft are safely integrated."

"The FAA will complete its statutory obligations to integrate UAS into the national airspace as quickly and efficiently as possible," the letter continues. "However, we must fulfill those obligations in a thoughtful, prudent manner that ensures safety, addresses privacy issues, and promotes economic growth."

Caucus member Rep. Steve Austria (R-OH), who represents a district in which one of the sites might be located, called the delay "unacceptable." He told the Dayton Daily News that “The reasons they’re giving us are the reasons they gave us four years ago.”

FMI: www.faa.gov

Advertisement

More News

Airborne 02.19.20: Sport Pilot Academy, 2019 Avionics Report, WWII Planes

Also: King Air 350ERs, Space Camp, Fly Your Pitts To SnF 2020, Blue Origin The benefits of immersive, small group flight instruction are coming to Oshkosh again in 2020, as the EAA>[...]

Garmin GTN Xi Series Approved For Helicopters

Direct Slide-In Upgrade To The Previous Generation GTN 650/750 Garmin has received FAA approval for the installation of its GTN 650Xi and GTN 750Xi in select helicopter models. Des>[...]

Airborne 02.21.20: Pipistrel Alpha Electro, Special Rotax, ASTM Parachute Std

Also: P-51 Mustang Over Pearl, Elite Balloon Instructor, ATR 72-600, Boeing 737 Max Issues... Again Pipistrel has signed an MOU with Eyre to There Aviation of Adelaide, Australia f>[...]

Airborne 02.21.20: Pipistrel Alpha Electro, Special Rotax, ASTM Parachute Std

Also: P-51 Mustang Over Pearl, Elite Balloon Instructor, ATR 72-600, Boeing 737 Max Issues... Again Pipistrel has signed an MOU with Eyre to There Aviation of Adelaide, Australia f>[...]

AMA Drone Report 02.20.20: Aerobatic Drone, Michigan Ruling, AMA v SecTrans

Also: 19000 NPRM Comments, ABA on Drones, RID Flyer, DJI Releases RID Video A drone capable of carrying a person and performing aerobatics has been built and flown by Drone Champio>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC