Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Oct 24, 2014

Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In

First New Runway Constructed In Mississippi In More Than A Decade

The first new runway constructed in more than a decade in the state of Mississippi will be unveiled at a celebratory ribbon cutting and aircraft fly-in at the Copiah County Airport (M11) on Saturday, November 1 at 10 a.m.

The new 4,000 x 75-feet runway, with runway lights and pilot navigational aids, replaces an outdated 3,000-foot runway. Aircraft operators will benefit from the longer length and allows the airport to welcome more complex aircraft, according to Ronnie Barlow, County Administrator.

“Not only has our safety and operational capacity been improved with this new runway, but the economic impact opportunities to enhance our communities and county will have a tremendous long-term benefit.” he explained.

An airport fly-in will be hosted by the County and Grassroots Aviation, the airport’s Fixed Base Operator, along with a special ribbon cutting ceremony as part of the Saturday celebration. Invited guests include the Copiah County Board of Supervisors; local community leaders; Rans Black, Manager of the FAA district office in Jackson; Tommy Booth, aeronautics director for the Mississippi Dept. of Transportation; Congressman Bennie D. Thompson (D), representing the 2nd District of Mississippi; and U.S. Senators Thad Cochran (R) and Roger Wicker (R).

The new runway cost approximately $6 million for land acquisition, design and construction. The FAA paid 90 percent of the project cost with Copiah County and MDOT paying the remaining 10 percent. It is the first new airport runway construction since the 2003 opening of the new Tunica airport.

FMI: www.copiahcounty.org

Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC