Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Oct 24, 2014

Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In

First New Runway Constructed In Mississippi In More Than A Decade

The first new runway constructed in more than a decade in the state of Mississippi will be unveiled at a celebratory ribbon cutting and aircraft fly-in at the Copiah County Airport (M11) on Saturday, November 1 at 10 a.m.

The new 4,000 x 75-feet runway, with runway lights and pilot navigational aids, replaces an outdated 3,000-foot runway. Aircraft operators will benefit from the longer length and allows the airport to welcome more complex aircraft, according to Ronnie Barlow, County Administrator.

“Not only has our safety and operational capacity been improved with this new runway, but the economic impact opportunities to enhance our communities and county will have a tremendous long-term benefit.” he explained.

An airport fly-in will be hosted by the County and Grassroots Aviation, the airport’s Fixed Base Operator, along with a special ribbon cutting ceremony as part of the Saturday celebration. Invited guests include the Copiah County Board of Supervisors; local community leaders; Rans Black, Manager of the FAA district office in Jackson; Tommy Booth, aeronautics director for the Mississippi Dept. of Transportation; Congressman Bennie D. Thompson (D), representing the 2nd District of Mississippi; and U.S. Senators Thad Cochran (R) and Roger Wicker (R).

The new runway cost approximately $6 million for land acquisition, design and construction. The FAA paid 90 percent of the project cost with Copiah County and MDOT paying the remaining 10 percent. It is the first new airport runway construction since the 2003 opening of the new Tunica airport.

FMI: www.copiahcounty.org

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC