Boeing's Dreamliner Starts Flying Again... Test Flights Only | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Feb 11, 2013

Boeing's Dreamliner Starts Flying Again... Test Flights Only

FAA Sanctioned Test Flights Resume

Over the weekend Boeing performed a successful test flight with one of its 787 test flight aircraft as part of the ongoing investigation into the Dreamliner's APU battery issues. Test flights with the 787 were authorized Thursday by FAA Administrator Michael Huerta and DOT Secretary Ray LaHood.

The flight departed from Boeing Field at 12:32 p.m. Pacific time on Saturday, Feb. 9, with a crew of 13 onboard (Boeing pilots and flight test personnel). The flight lasted 2 hours and 19 minutes, landing back at Boeing Field at 2:51 p.m. Pacific time. The crew reports that the flight was uneventful.

During the flight, the crew monitored the performance of the main and APU batteries. Special equipment onboard ZA005, which is currently the only member of the Boeing 787 flight test fleet in service, allowed the crew to observe and record detailed battery performance in normal flight conditions. Because the flight was part of the ongoing investigation no other detailshave been released.

Meanwhile Boeing has begun to alert customers to possible delays in upcoming Dreamliner deliveries as the investigation drags on. Norwegian is the first customer to be alerted having been told by Boeing that their first Dreamliners - due to be delivered in April and June, could be delayed. Boeing has not announced a new delivery date or given a written confirmation of a potential delay.

FMI: www.boeing.com

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC