AD: Grob-Werke | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 21, 2006

AD: Grob-Werke

AD NUMBER: 2006-17-02
MANUFACTURER: Grob-Werke
SUBJECT: Airworthiness Directive 2006-17-02
SUMMARY:
The FAA supersedes Airworthiness Directive (AD) 84-09-05, which applies to certain GROBWERKE GMBH & CO KG (previously identified as BURKHART-GROB FLUGZEUGBAU INDUSTRIESTRABE) Model G102 ASTIR CS sailplanes. AD 84-09-05 requires you to install a modified spherical locking bolt and nut in the forward horizontal stabilizer connection to the vertical stabilizer and install new locking pins in the aft connecting plate for the horizontal stabilizer. Since we issued AD 84-09-05, fatigue cracks were found in the modified spherical locking bolt. Consequently, this AD requires you to replace the modified spherical locking bolt, the retaining pins (collar bolts), and associated hardware; add a life limit on the spherical locking bolt and the retaining pins; and repetitively inspect the front and rear horizontal stabilizer attachment. This AD results from mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Germany. We are issuing this AD to prevent cracks in the spherical locking bolt, which could result in failure of the horizontal stabilizer connection. This failure could lead to loss of control.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC