NTSB Issues Second Update On British Airways Engine Fire At Las Vegas | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Oct 07, 2015

NTSB Issues Second Update On British Airways Engine Fire At Las Vegas

Finds A Portion Of The Stage 8-10 Spool Failed

As part of its ongoing investigation into the September 8, 2015, engine fire during takeoff of British Airways flight 2276, a Boeing 777, at McCarran International Airport, Las Vegas, the NTSB has released additional information about the uncontained engine failure.

NTSB investigators disassembled and documented the GE90 engine at the GE facility in Evandale, Ohio. Group members from the FAA, GE, and Boeing, along with the United Kingdom’s accredited representative from the Air Accidents Investigation Branch and their technical advisor, British Airways, were in attendance.

Engine examination revealed that a portion of the stage 8-10 spool in the high-pressure compressor (HPC) section had failed, liberating fragments that breached the engine case and cowling. Additional pieces of the HPC spool were recovered from inside the engine and retained for metallurgical examination.

The NTSB Materials Laboratory examined engine parts gathered from the scene. HPC parts recovered during the disassembly of the engine were examined at the GE facility. All pieces of the damaged stage 8 disk rim have been collected.

The fracture initiated in the HPC stage 8 disk web, a part of the stage 8-10 spool. The NTSB will continue metallurgical evaluations of the disk and the fracture features.

The NTSB said GE is performing high-priority, focused inspections of HPC hardware from other GE90 engines. The inspection data is being gathered to support the investigation and to determine further investigative actions.

Additional updates will be provided as new factual information is developed.

(Source: NTSB news release. Image from file)

FMI: www.ntsb.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC