Tue, Jun 04, 2013
Functional Testing On Northrop Grumman-Built Spacecraft Completed
A Northrop Grumman Corporation-led team recently completed the third gate review of its first Modular Space Vehicle (MSV) bus assembly, integration and test, marking completion of functional testing. The team will conduct comprehensive "day in the life" testing next for the Operationally Responsive Space-2 (ORS-2) bus, leading to hardware acceptance by the Air Force's ORS program office. To mark this occasion, the ORS office held an open house on May 9 at Applied Technology Associates in Albuquerque, NM, where hardware integration and test were performed.
Northrop Grumman's MSV spacecraft design is the first to implement a modular, rapidly reconfigurable architecture using open standards developed by an industry consortium in conjunction with the Air Force Research Laboratory and the Air Force's ORS Office at Kirtland Air Force Base, NM. "Completing these test processes will show that our design meets ORS' program objective requirements and moves the government closer to the launch of this first-of-its-kind vehicle that could revolutionize the way spacecraft are built," said Doug Young, vice president, Missile Defense and Advanced Missions, Northrop Grumman Aerospace Systems. "We are bringing network avionics technology to spaceflight and giving the nation an affordable option to respond to rapidly changing, multi-mission needs."
"The government's investment in the past two-and-a-half years has developed a scalable, open architecture capability that allows bus components and payload modules to plug into a central spacecraft network using standardized technology, much like the way new hardware can be plugged into computers via USB ports," said Phil Katz, Northrop Grumman's MSV program manager.
Northrop Grumman is performing MSV-related study and hardware development under a five-year contract awarded in November 2010 by NASA's Ames Research Center, Moffett Field, CA, supporting the Air Force's Operationally Responsive Space Office. Northrop Grumman has successfully used this rapid development approach before, building and launching the award-winning Lunar CRater Observation and Sensing Satellite for NASA Ames in just 27 months.
(Modular Space Vehicle image provided by Northrop Grumman)
More News
States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]
From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]
Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]
Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]
Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]