AD (Australia): Lear | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Sep 02, 2003

AD (Australia): Lear

AD/LJ45/7 Main Landing Gear Trunnion Shear Pins 11/2003
Applicability: Model 45
aircraft, serial numbers 45-005 through 45-208, 45-210 through 45-222, 45-224, 45-225, 45-227, and 45-229 through 45-231.
Note: FAA AD 2003-16-09 Amdt 39-13262 refers.


Compliance:
1. Within 14 days after 3 September 2003.
2. Before the accumulation of 1,800 total landings on the shear pins, or within 100
landings after 3 September 2003, whichever occurs later.
This Airworthiness Directive becomes effective on 3 September 2003.
Background: Results of fatigue testing conducted by the manufacturer on the main landing gears of Learjet 45 aircraft indicate that certain shear pins on the trunnion assemblies of the main landing gears do not meet the expected life limit. The results of fatigue testing also indicated that the shear pin bushings in the trunnion fitting housings had migrated outward from the fitting, which further weakened the shear pins and contributed to premature failure. This condition, if not corrected, could result in collapse of a main landing gear, and consequent reduced controllability of the aircraft during takeoff and landing.

FMI: www.casa.gov.au/avreg/aircraft/ad/ADfiles/Over/lj45/LJ45-007.pdf

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC