Concerns Linger Over Air Tanker Safety | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 04, 2006

Concerns Linger Over Air Tanker Safety

Fire Fighting Planes To Get Voice Recorders

As the forest and brush fire season starts the summer, safety concerns over aerial tankers have prompted more detailed safety and fatigue inspections.

Currently half of the federal governments tankers used in the 2004 fire fighting season are grounded due to questions of their airworthiness, according to the Associated Press. This leaves only 16 aerial tankers ready for this year's season.

Those P-2V and P-3 tankers that are in the fleet are expected to have cockpit voice recorders in place this year, said Larry Brosnan, the Forest Service's assistant director for fire and aviation. The P-2Vs, which are older, will also be inspected for structural fatigue.

Three aerial tankers went down between 1994 and 2002 after one or both wings snapped off in-flight. The National Transportation Safety Board concluded that inadequate maintenance procedures failed to detect fatigue cracks in the wings.

The NTSB says that companies that converted military P-2Vs and P-3s to firefighting duty didn't have access to the number of hours individual tankers had flown.

While operators and pilots are concerned about aircraft fatigue and the stresses on older aircraft, Forest Service officials said that the problem may have been overlooked inadvertently.

"I don't believe anybody in the past, present or future is going to turn a blind eye to a safety concern," said Jeff Holwick, a regional aviation safety inspector with the Forest Service. "We just didn't know the nitty-gritty of where to actually look, and now we do."

Avenger Aircraft and Services, a consulting firm that crafted the new maintenance program for P-2Vs (above), found 47 spots on the wings and tail that require more detailed inspections to find problems early, said James Burd, co-owner of the consulting firm.

The new inspections so far have found some wing cracks that could have caused problems if untended, but no widespread problems, Burd said.

According to the AP, inspection of the P-3s (right), a successor to the P-2Vs, is based on a Navy program that takes into account factors such as metal fatigue, said John Nelson, an aviation management specialist with the Forest Service.

P-3s were cleared for a return to service in mid-2004, when the government said the tankers' airworthiness had been determined.

While cockpit voice recorders are to be added this year, flight-data recorders that experts like Hall have recommended are not.

"We're still trying to improve, still trying to do better," Brosnan said. "But it's not something that happens overnight."

A plan for modernizing the overall aviation program is expected at year's end, he said.

FMI: www.fs.fed.us

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC