NASA Readies Orbiters For Upcoming Flights To ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jun 02, 2007

NASA Readies Orbiters For Upcoming Flights To ISS

Atlantis Ready For Launch; Endeavour, Discovery In The Wings

Officials with NASA updated ANN this week on the status of the equipment slated to fly the next three shuttle missions to the International Space Station... Ed.

Mission: STS-117 - 21st International Space Station Flight (13A)
S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: June 8, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At the Launch Readiness Review meeting this week, Space Shuttle Program managers officially set the STS-117 launch date for June 8. At Launch Pad 39A, operations are proceeding on schedule to meet that date. This week, the orbiter, ground and solid rocket booster pyro initiator circuit resistance tests were completed. The orbiter midbody umbilical unit mate operations were also performed. Aft closeout operations are under way, with completion scheduled for this weekend. Stowage of flight crew equipment is in progress, and ordnance installation is complete. This weekend, the orbiter's main engines, orbital maneuvering system and forward reaction control system will be pressurized for flight.

Mission: STS-118 - 22nd International Space Station Flight (13A.1)
S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug. 9, 2007 Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, Endeavour's aero surfaces, such as the elevons, body flaps and rudder speed brake, are configured for modal testing, which checks the structural integrity of the vehicle. Nose landing gear door rigging is nearing completion. Closeout of the orbiter's aft and forward sections is under way. Work is also nearing completion on structural leak checks of the orbital maneuvering system pods, forward compartment and forward reaction control system.

In high bay No. 1 of the Vehicle Assembly Building, stacking of the solid rocket boosters continues for STS-118.

Mission: STS-120 - 23rd International Space Station Flight (10A) -
U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Testing of the "shuttle to station power transfer system" is complete. Functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, continued this week. Modifications to Discovery's engine cutoff sensor wiring continue, as does the installation of BRI tile around the main landing gear doors and external tank doors.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC