AD: Fokker Services B.V. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jan 16, 2018

AD: Fokker Services B.V. Airplanes

AD NUMBER: 2018-01-09

PRODUCT: Certain Fokker Services B.V. Model F28 Mark 0100 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 95-25-02, which applied to the aircraft listed above.

AD 95-25-02 required inspection(s) to detect cracks of the fuselage-mounted half of hinge assemblies of the small cargo door, and replacement of any cracked hinge assembly with a new hinge assembly.

This new AD was prompted by a report that the hinges of the small cargo door are made of a material that is sensitive to stress corrosion and fatigue cracking, and by the determination that the existing inspection program does not provide sufficient protection against fatigue-induced cracks.

This AD requires contacting the FAA to obtain instructions for addressing the unsafe condition on these products, and doing the actions specified in those instructions.

DATES: This AD becomes effective January 29, 2018. Comments on this AD must be received by February 26, 2018.

COST: Currently, there are no affected U.S.-registered airplanes. Should an affected airplane that be placed on the U.S. Register in the future, the FAA estimates the cost of compliance for this AD to be $170 per aircraft per inspection cycle. Repairs are estimated to cost up to $23,510 per aircraft for parts and labor.

FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC