Shuttle Back-Ups Probable For First Two Missions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Aug 06, 2004

Shuttle Back-Ups Probable For First Two Missions

Playing It Safe For The Return To Flight

NASA is most assuredly playing it safe when the space shuttles return to flight next year. In both of the first two launches, the space agency plans to have a back-up shuttle on the pad, ready to go in case of emergency.

"After that, we will take a look and evaluate. .. and see where we need to go from there," said John Casper, a former astronaut now leading NASA's effort to implement recommendations made by the Columbia Accident Investigation Board. He was quoted in the newspaper Florida Today.

Discovery is the first shuttle set to launch next Spring. If something goes terribly wrong with that flight, its crew will divert to the International Space Station. If that happens, the shuttle Atlantis will be ready to launch on a rescue mission within 45 days. If, during the second shuttle mission following the February, 2002 Columbia disaster, there is a life-threatening problem, a rescue mission could be mounted to the ISS within 58 days.

In both cases, the time lag represents what NASA believes to be the limit of food and water aboard the ISS.

"We need to understand the fixes that we've done we need to understand how well the systems work," shuttle program manager Bill Parsons was quoted by the paper as saying.

Florida Today also reports the initial requirement to launch shuttles only in daylight could also go away after the first two successful missions. By eliminating both requirements as set forth by the CAIB, NASA will have made great strides in meeting President Bush's vision for the Moon, Mars and Beyond. That vision requires the ISS be completed and the shuttles retired by 2010. To do that, the shuttles will have to fly up to six times a year.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC