Military Analysts Say Russian 5th Generation Fighter Is On Hold | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Sun, Dec 17, 2017

Military Analysts Say Russian 5th Generation Fighter Is On Hold

Su-57 Is Not Likely To Enter Serial Production Until 2027

A policy memo drafted by a senior Russian policy analyst at Harvard University says that the Russian 5th Generation Su-57 aircraft is on hold for at least a decade.

In the memo published by PONARS Eurasia, analyst Dmitry Gorenburg writes that while the Russians appear to be working to stay ahead of many competitors in areas like anti-ship missiles and electronic warfare, it lags behind in other, significant categories.

In terms of air power, Gorenburg says that under the Russian State Armament Program (SAP) for 2018-2027 which lays out Russia's rearmament priorities for the next 10 years, Sukhoi's 5th generation fighter, the Su-57 (formerly the T-50 or PAK-FA) will not enter serial production until upgraded engines are ready, which is not likely before 2027. "Over the next eight years, Russia will continue to purchase small numbers of these planes for testing. It will also continue to purchase Su-35S fighter jets, with a new contract for 50 additional aircraft signed in late 2016," Gorenburg wrote. "Purchases of Su-30SM fighter jets and Su-34 strike aircraft will also continue, most likely at rates of 12-18 aircraft per year of each type. Mikoyan MiG-35 fighter aircraft may also be procured, but probably not in large numbers.

"Overall, with many modern fighter aircraft now in place, rates of procurement will slow in order to allow for the purchase of other types of aircraft. The same goes for military helicopters, since the Russian military has received what it needs in new helicopters during the last seven years. Development of a new high-speed helicopter will not start until after 2027," he concludes.

The analyst says that one area of focus will be transport and refueling aircraft, which have been a area of weakness for the Russian Air Force. Serial production of the Ilyushin Il-76-MD90A, which has been plagued with development problems, is expected to start in 2019.

(Image from file)

FMI: Full Analysis

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC