Hurricane Nicole Delays NASA Resupply Launch to Space Station | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Oct 13, 2016

Hurricane Nicole Delays NASA Resupply Launch to Space Station

Storm Is Threatening Bermuda Where A Critical Tracking Station Is Located

NASA and its partner Orbital ATK have postponed the launch of the company’s next commercial resupply mission to the International Space Station to no earlier than Sunday, Oct. 16, as the agency prepares for Tropical Storm Nicole at its tracking site in Bermuda.

A Sunday launch would occur at 8:03 p.m. EDT from NASA’s Wallops Flight Facility in Virginia, with a five-minute window. The launch will air live on NASA Television and the agency’s website beginning at 7 p.m. The date of the arrival of the Orbital ATK Cygnus spacecraft to the space station is to be determined.

As the spacecraft’s trajectory takes it from Wallops and past Bermuda on its flight into orbit, the Bermuda tracking station provides downrange tracking, telemetry and flight termination support. Tropical Storm Nicole is expected to reach Bermuda as a hurricane Thursday, Oct. 13.

“The tracking station at Bermuda is required to conduct the Antares launch from Wallops,” said Steven Kremer, chief of the Wallops Range and Mission Management Office. “The ability to support a launch will depend on the impact the storm has on not only our systems, but also the overall Bermuda infrastructure.”

After the storm system has passed Bermuda, the Wallops team will conduct a damage assessment, perform mission readiness testing, and bring the site back up to operational status.

(Image provided with NASA news release)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC