Boeing Confirms P-8A Poseidon Airframe's Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Jan 21, 2011

Boeing Confirms P-8A Poseidon Airframe's Structural Integrity

Full Scale Static Tests Exceed Highest Expected Flight Loads By 50 Percent

Boeing said Thursday that it completed full scale static testing of the P-8A Poseidon’s airframe on Jan. 7. The series of tests, which began in May 2009, confirmed the airframe's structural integrity. “The structure performed as we expected throughout testing, allowing us to efficiently expand the P-8A’s flight-test envelope,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our static test plan was successful thanks to the combined efforts of Boeing’s design, analysis, and test teams and our U.S. Navy customer.”

S1 -- the program’s full-scale static ground-test vehicle -- underwent 154 different tests in which it sustained loads equal to or greater than those expected to occur during operational flights, with no failure of the primary structure. During 74 of the tests, the airframe was subjected to 150 percent of the highest expected flight loads. More than 4,000 installed strain gages and calibrated parts captured data for analysis.

In September, the Boeing P-8A team will begin refurbishing S1 to prepare it for live-fire testing at Naval Air Warfare Center, China Lake, Calif. Boeing will begin fatigue tests on its second ground-test vehicle, S2, later this year. The Navy plans to purchase 117 of the P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

A derivative of the Boeing Next-Generation 737-800, the P-8A Poseidon is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

FMI: www.boeing.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC