Vought Successfully Delivers Fifth 787 Aft Fuselage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11-21-22

Airborne-UnCrewed-11.22.22

Airborne-Unlimited-11.23.22

Airborne-FltTraining-HOLIDAY

Airborne Unlimited-HOLIDAY

Wed, Apr 30, 2008

Vought Successfully Delivers Fifth 787 Aft Fuselage

First To Include Structures, Systems Components

Vought Aircraft Industries, Inc. delivered its fifth composite aft fuselage section for the Boeing 787 Dreamliner earlier this month. The fuselage, designated for Airplane #3, is the first airplane shipset delivered by Vought that includes structures and the start of systems components, which will reduce the time needed to integrate the component during final assembly in Everett, WA.

The company is on track for future deliveries, Vought pointedly adds. As ANN reported last November, Vought came under additional scrutiny from Boeing due to issues with quality, inventory costs and work-related injuries. Earlier this month, Boeing agreed to acquire Vought's interest in South Carolina-based Global Aeronautica LLC, which makes fuselage subassemblies for the 787.

"We have successfully demonstrated our commitment to the quality and level of completeness of our aft sections to the 787 Dreamliner program, while at the same time effectively reducing the amount of traveled work to Boeing," said Joy Romero, vice president of Vought’s 787 division. "In recent reviews with Boeing, they have indicated that Vought is taking the right actions in continuing to improve completeness and adding value to the program."

Vought has fabricated a total of 35 fuselage barrels - including the five shipsets that have been delivered to Boeing, seven shipsets that are in work at the Vought facility and one developmental unit -- since production activities began in June 2006. This number includes those designated for full-scale static and fatigue testing, which will not be delivered to customers.

Each aft fuselage shipset delivered to Boeing consists of two, one-piece composite barrels (sections 47 and 48). These are fabricated at Vought’s new 342,000-square-foot facility using advanced fiber placement technology. The barrels are then joined together, with electrical, hydraulic and mechanical systems components installed prior to shipping to Boeing for final assembly in Everett.

Aft fuselage Section 47 measures 19 feet in diameter and 23 feet long. It is the last passenger section and cargo hold section of the 787, which includes the pressure bulkhead. Section 48 is 14 feet in diameter and 16 feet long. The horizontal stabilizer and vertical fin are integrated into Section 48 at Boeing final assembly.

Vought has extensive experience building composite structure, primarily on military aircraft -- including the Global Hawk UAV wing, C-17 horizontal stabilizer and nacelle, V-22 fuselage and B-2 intermediate wing assemblies.

FMI: www.voughtaircraft.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (11.24.22)

Aero Linx: The LeRoy W. Homer Jr. Foundation The LeRoy W. Homer Jr. Foundation was established to provide financial support and encouragement to young people, with an interest in a>[...]

Aero-News: Quote of the Day (11.24.22)

"Tonight, an MH-60R Seahawk helicopter attached to Helicopter Maritime Strike Squadron 41 made an emergency landing at Brown Field in San Diego after experiencing a collision with >[...]

ANN's Daily Aero-Term (11.24.22): IFR Takeoff Minimums And Departure Procedures

IFR Takeoff Minimums And Departure Procedures Procedures Title 14 Code of Federal Regulations Part 91, prescribes standard takeoff rules for certain civil users. At some airports, >[...]

ANN's Daily Aero-Term (11.25.22): Intermediate Fix

Intermediate Fix The fix that identifies the beginning of the intermediate approach segment of an instrument approach procedure. The fix is not normally identified on the instrumen>[...]

Aero-News: Quote of the Day (11.25.22)

“We can’t let winter weather stop aircraft from safely landing and taking off. This funding will help keep airports operating this winter and get passengers and cargo t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2022 Web Development & Design by Pauli Systems, LC