Sat, Jan 01, 2022
AD 2021-24-02 Prompted By Reports Indicating Incidents Of Wires Chafing
The FAA is adopting a new airworthiness directive (AD) for all The Boeing Company Model MD-11 and MD-11F airplanes.
This AD was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. This AD requires, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective February 1, 2022.
Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all The Boeing Company Model MD-11 and MD-11F airplanes.
The NPRM published in the Federal Register on August 18, 2021 (86 FR 46167). The NPRM was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. In the NPRM, the FAA proposed to require, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address wire chafing and arcing on the panel, which could cause damage to equipment, and result in loss of electrical power and a possible in-flight fire.
More News
With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]
Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]
“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]
"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]
IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]