Engineers Say Dreamliner May Not Fly This Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jul 24, 2009

Engineers Say Dreamliner May Not Fly This Year

Structural Problems More Difficult To Repair Than Originally Thought

Two engineers with knowledge of the situation say that the structural issues with the B787 Dreamliner are more complex than originally described by Boeing, and the maiden flight of the aircraft could still be months or more in the future.

The engineers told The Seattle Times that the issue involves an area where the wing joins the fuselage, caused by high stress loads at the ends of the stringers in the upper skin of the wing. As the wings flex during flight, the stress loads could cause the composite stringers to delaminate from the skin. This condition occurred during wing flex tests.  The engineers said while this is not likely to lead to a catastrophic failure of the wing, it would require constant and expensive monitoring and repair over the aircraft's life.

The repair as described to the paper by the engineers is extensive, and involves someone inside the wing of the aircraft first relieving and then reinforcing the stress points. They said the repair would need to be completed on the non-flying test aircraft before proceeding on to the flight-test models.

The delamination showed up during the maximum load test of the wing, which the engineers said is 50 percent higher that is expected in normal operation, though it is unknown if it began at lower stresses and was masked by titanium components in the wing. The repair will have to be monitored at every stress level during subsequent tests.

 

The engineers told the Times that Boeing's focus now is on repairing the current Dreamliners so testing can resume, and that it has not been determined at what point in the production process a permanent fix would be implemented.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC