FAA Administrator Huerta Dedicates New Taos Runway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 29, 2017

FAA Administrator Huerta Dedicates New Taos Runway

Federal Grants Totaling About $25 Million Paid For Most Of The Project

Culminating a two-decade-long effort, FAA Administrator Michael P. Huerta on Friday joined local and state officials in dedicating the new, 8,600-foot runway at Taos Regional Airport.

The new runway is perpendicular to the original runway. It will enable pilots to operate more safely at times of year when wind directions make the airfield more challenging.

The project also comes with important provisions aimed at protecting the lands and lifestyle of the Taos Pueblo.

“An airport is a treasure. It is the lifeblood of a community, an asset that must be nurtured,” Huerta said. “The result of our collaborative efforts is a project that will improve both the safety and utility of this important regional transportation link, while respecting the traditional values and unique culture of the Taos Pueblo.”

Federal grants totaling about $25 million paid for most of the project cost.

The environmental review for the project included extensive government-to-government consultation with the Taos Pueblo, Town of Taos and numerous state and federal agencies.

This resulted in a number of mitigations, including the installation and operation of a passive noise monitoring system. The system, which began operating in 2014, will support a pre-project and post-project comparison of flights over the Taos World Heritage Site and adjacent lands.

Additionally, the FAA raised the voluntary minimum flight altitude above the World Heritage site from 2,000 feet to 5,000 feet.

“We got this project right because all of the stakeholders approached this in a spirit of collaborative partnership,” Huerta said. “Without tenacity, dedication and determination we would not be standing here today.”

(Image provided with FAA news release)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC