Falcon 2000s Get Winglets | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, May 11, 2009

Falcon 2000s Get Winglets

Aviation Partners tells ANN that both the FAA and EASA have granted STC approval for its High Mach Blended Winglets on the Falcon 2000 Series. Certification of the Winglets represents the culmination of a three-year development program and exhaustive flight testing carried out in collaboration with Dassault Falcon Jet; a working relationship first announced at EBACE in 2007 at the launch of the 2000LX (the 2000LX is the 2000EX EASy with API Blended Winglet STC installed in production).

"Anytime you can improve the productivity and performance of an existing asset, while making it more eco-friendly, is a wise investment," said Joe Clark, API founder and CEO, "We are doing our part in a changing world."

The Winglets for the Falcon 2000 Series are "High Mach" Blended Winglets - this revolutionary new-design is optimized for cruise speeds of Mach .80 and higher. On the 2000EX the Winglets will provide a drag reduction of 5 percent at Mach .80, which equates to a 200+ nm range increase; at long-range cruise speeds the benefits are even greater. In addition the 5 to 7+ percent fuel savings provide a significant reduction in emissions.

The current in-service Falcon 2000 series fleet is over 400 aircraft. API has now turned its attention to certifying the same Winglets for the Falcon 900 series, followed by the Falcon 50. "With a combined in-service fleet of around 1,200 airframes the Falcon High Mach Blended Winglets should be our most successful business jet program to date," said Gary Dunn, API Vice President of Sales.

API is accepting orders for Falcon 2000 and 2000EX retrofits at EBACE; and, despite the current global economy has a substantial backlog of orders. Details of the installation center network will be announced shortly; downtime for the modification is anticipated to be around 15 days.

FMI: www.aviationpartners.com

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC