Tecnam Refutes Reports of P2012 Grounding | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Aug 19, 2020

Tecnam Refutes Reports of P2012 Grounding

"Tecnam Has Deemed It Necessary To Provide Additional Information To The Public"

Media reports suggesting a grounding of Cape Air airline P2012 commercial aircraft are being strongly refuted by personnel from Tecnam -- where some believe the initial reports have been taken out of context to provide click bait.

Complicating the issue is a limited statement given to media from a Cape Air PR rep, stating that, "Based on our desire to allow time for the Federal Aviation Administration and the European Aviation Safety Agency to have a dialogue regarding recent modifications, we have temporarily and voluntarily suspended operations with the Tecnam P2012 Traveller."

The Tecnam side of things provides more detail.

"Public announcements containing the word 'grounding' always receive attention, since this is a term in aviation indicating that a problem is serious enough to prevent an aircraft from flying. That is certainly not the case here, and for this reason Tecnam has deemed it necessary to provide additional information to the public.

As a preliminary note, Cape Air currently is our main customer, but not the only operator of the P2012 Traveller, the “next generation short-haul public transportation aircraft” entirely designed by Tecnam in Italy. Tecnam proactively works with the carrier to implement improvements to the P2012 as soon as they become available, with the ultimate goal of providing operators and passengers with the best possible flight experience. Cape Air expects that the P2012 Traveller will 'continue to evolve to be an even greater aircraft in the months and years ahead.'"

Tecnam blames the hysteria on their 'Constant Improvement Program (CIP).' The program offers minor improvements, such as new-style life-vest holders, holders for gust-lock bars or for company manuals, as well as various improvements that are capable of extending the service life of the aircraft.

Most recently; part of the improvement program. "involved components of the elevator trim control system, designed and manufactured to increase their long-term reliability and already embodied on all the P2012 aircraft. As the FAA were informed about these design changes, additional clarification requests related to the reasons behind some of those modifications were raised. As a result, a roundtable discussion between the FAA, EASA and Tecnam was established. In order to allow the authorities time to assess and process these clarifications without pressure, Cape Air unilaterally decided to keep their fleet temporarily on the ground."

To further explain the scenario, Tecnam Managing Director, Giovanni Pascale Langer, notes that, "It is always disturbing to hear the word grounded when referring to an aircraft. However, we would like to make it clear that this action is not related to technical issues or safety, but only for authority inspection of certain proposed changes. The safety of this aircraft is widely demonstrated by the rest of the P2012 Travellers currently in service, including both Tecnam-owned test aircraft which have accumulated hundreds of hours in the most demanding flight-test conditions, far away from the typical airline mission profile. Nevertheless, Tecnam is always fully committed to customers’ decisions and open to any discussions aimed at improvements introduced to the fleet.”

ANN has calls in to get further info and will report back when additional  info presents itself.

FMI: www.tecnam.com, www.capeair.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC