FAA Breaks Ground For New Air Traffic Tower At KGSO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Jun 06, 2019

FAA Breaks Ground For New Air Traffic Tower At KGSO

Will Replace An Existing 90-Foot-Tall Tower That Has Been In Operation Since 1974

The FAA has broken ground of a new Air Traffic Control Tower and Terminal Radar Approach Control (TRACON) at Piedmont Triad International Airport (KGSO) in Greensboro, N.C. The agency will invest $61 million in the new facility.

“This investment in infrastructure and technology will place the airport in an excellent position for future growth,” said Michael O’Harra, Regional Administrator of the FAA’s Southern Region. “The new facility will enable air traffic controllers to provide the safest and most efficient service to Piedmont Triad area travelers for decades to come.”  

“It has been 45 years since the current Air Traffic Control Tower was put into service, said  Steve Showfety, Chairman of the Piedmont Triad Airport Authority. “Today we are turning a page. This new tower will give us the modern infrastructure we need to live up to the vision of our master plan and will allow the Piedmont Triad International Airport to continue to add new passenger service, serve our current tenants and also add new tenants who will bring investment and jobs to the community.”

The new control tower will be 180 feet tall, topped by a 550-square-foot tower cab to accommodate up to eight positions for air traffic controllers. The 15,650-square-foot base building will anchor the new tower and will house the Terminal Radar Approach Control (TRACON) with up to 10 radar positions for air traffic controllers. The TRACON controls airspace within a 60-mile radius of the airport, which includes 20 general aviation airports. It will be equipped with the latest technology for communications and navigation.

Construction began in April 2019, and the FAA expects to commission the facility in 2022. Total cost is $61 million: $41 million for construction and $20 million for equipment and installation, cabling, telecommunications, and construction of a new communications transmitter/receiver. The cost of demolition of the existing facility and disposal of the equipment also is included in the total.

North Carolina is the only state where the FAA is building two new air traffic control facilities. The FAA will commission the new 370-foot-tall tower at Charlotte Douglas International Airport in summer 2020.

The KGSO tower will allow air traffic controllers to manage flights safely and efficiently at North Carolina’s third busiest airport. Greensboro Tower controlled 85,700 flights and the TRACON handled 150,000 radar operations in the 12 months ending on April 30, 2019.

The FAA awarded the construction contract to Archer Western Construction, LLC, of Chicago, Ill., in October 2018. The new facility will replace the existing 90-foot-tall tower that has been in operation since 1974.

(Image provided with FAA news release)

FMI: www.faa.gov

Advertisement

More News

Aero-News: Quote of the Day (12.09.25)

“We respectfully call on the City of Mesa to: 1. Withdraw the landing fee proposal immediately 2. Engage with the aviation community before making decisions that impact safet>[...]

ANN's Daily Aero-Term (12.09.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.09.25)

Aero Linx: International Federation of Airworthiness (IFA) IFA uniquely combines together all those with responsibility for policies, principles and practices concerned with the co>[...]

NTSB Final Report: Diamond Aircraft Ind Inc DA20C1 (A1); Robinson Helicopter R44

Controller’s Expectation That VW02 Would Have Departed Sooner Led To An Inadequate Scan And Loss Of Situational Awareness Analysis: A Robinson R-44 helicopter N744AF, VW02 (V>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC