STS-124 Crew Settles Into Life In Orbit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 02, 2008

STS-124 Crew Settles Into Life In Orbit

Spends First Full Day Preparing For Monday Docking With ISS

The STS-124 crew members aboard space shuttle Discovery began their first full day in space Sunday, by inspecting the orbiter’s heat shield and preparing for their impending arrival at the International Space Station.

Crew members used the shuttle’s robotic arm to perform a limited inspection of Discovery's thermal shield and the leading edges of its wings. The purpose of this inspection was to ensure no damage occurred to the protective tiles during launch.

As ANN reported, a chunk of insulating foam from the shuttle's external fuel tank struck the underside of the orbiter at T-plus 3:30 during Discovery's launch Saturday afternoon. While mission managers seem largely unconcerned about any damage caused by the foam, the fact it happened at all should give mission managers some pause.

STS-124 was the first launch to utilize an "in-line" external tank, sporting built-in modifications intended to reduce the risks of catastrophic damage to the orbiter from chunks of insulating foam. Previous tanks used since Discovery's first Return to Flight mission in July 2005, following the 2003 loss of Columbia, featured a number of modifications intended to reduce foam shedding... but STS-124 was the first to use an external tank designed from the ground-up to incorporate such changes.

The new design includes a new protuberance air load (PAL) ramp design, and titanium O2 line support brackets... both measures intended to resist ice formation.

It's impossible to completely eliminate foam shedding, simply due to the (admittedly flawed) nature of the tank's design... though NASA believed they had the shedding problem largely resolved prior to Discovery's launch. That a large chunk still separated may prove disquieting, though NASA officials believe the foam hit the orbiter late enough in the launch phase -- during which atmospheric stresses are negligble -- to not pose a significant risk for catastrophic damage.

If required, the usual detailed inspection of the heat shield will be performed later in the mission after the Orbiter Boom Sensor System (OBSS) has been returned to Discovery. The OBSS is needed to perform a complete scan, but was stowed on the station during STS-123 to make room for the Kibo laboratory’s Japanese Pressurized Module in Discovery’s payload bay.

Discovery’s crew members extended the Orbiter Docking System Ring and checked out rendezvous tools in preparation for their arrival at the station.

In addition, the STS-124 astronauts checked out spacesuits they will use during the mission’s three scheduled spacewalks at the station and participated in media interviews with radio and television stations in Minneapolis, MN and Bryan, TX.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC