AD: General Electric | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jan 11, 2010

AD: General Electric

AD NUMBER: 2009-26-09

MANUFACTURER: General Electric Company CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 Turbofan Engines
SUBJECT: Airworthiness Directive 2009-26-09

SUMMARY: The FAA is superseding an existing airworthiness directive (AD) for General Electric Company (GE) CF34-1A, -3A, -3A1, -3A2, -3B, and -3B1 turbofan engines. That AD currently requires a onetime visual and tactile inspection of certain areas of certain P/N and SN fan disks for an arc-out defect, within 20 engine flight hours after the effective date of that AD. This AD requires inspecting certain fan disks for electrical arc-out indications, removing from service fan disks with electrical arc-out indications, performing tactile and enhanced visual (TEV) inspections, fluorescent penetrant inspections (FPI), and eddy current inspections (ECI) on certain disks that have already had a shop-level inspection, and repetitive FPI and ECI on certain fan disks. This AD results from an updated risk analysis by GE that shows we need to take corrective action that is more stringent. We are issuing this AD to prevent an uncontained failure of the fan disk, which could result in damage to the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/4E1E540EFF12FC83862576A40050A26F?OpenDocument

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC