Vega To Fly ESA Experimental Reentry Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, Dec 20, 2011

Vega To Fly ESA Experimental Reentry Vehicle

Launch Of IXV Planned In 2014 From French Guiana

The launch of ESA's IXV Intermediate eXperimental Vehicle on Europe's new Vega rocket is now in detailed planning, a major step towards the craft's flight in 2014. After launch into a suborbital trajectory from Europe's Spaceport in French Guiana, IXV will return to Earth as if from a low-orbit mission, to test and qualify new critical technologies for future reentry vehicles.

ESA IXV Artist's Rendering

The flight profile calls for the IXV to attain an altitude of around 279 miles, allowing it to reach a velocity of 4.6 miles/second on entering the atmosphere. It will collect a large amount of data during its hypersonic and supersonic flight, while it is being controlled by thrusters and aerodynamic flaps. IXV will then descend by parachute and land in the Pacific Ocean to await recovery and analysis.

ESA and the Arianespace launch provider signed a contract on 14 December to study the launch on Vega, as part of the VERTA - Vega Research and Technology Accompaniment - program.

The rocket's qualification flight planned for liftoff at the end of January will pave the way for the next five VERTA missions that will demonstrate the system's flexibility. At a planned rate of two launches per year, the program will allow the smooth introduction of Vega for commercial exploitation. Following development of critical technologies and completion of the design, the vehicle's manufacturing, assembly, integration and qualification is now under way for a flight window between January and September 2014.

Procurement of the ground network has begun, including the mission control center, ground station telemetry kits, transportable antennas and communication network.

FMI: www.esa.int

Advertisement

More News

X-47B Accomplishes Its First Ever Carrier Touch And Go

Maneuver Performed Aboard CVN 77 The Navy's X-47B Unmanned Combat Air System Demonstrator (UCAS-D) began touch and go landing operations aboard the aircraft carrier USS George H.W.>[...]

Honeywell's New HTF7350 Engine To Power Bombardier Challenger 350

HTF7000 Series Surpasses 1.5 Million Flight Hours With Better Than 99 Percent Dispatch Reliability Honeywell has announced that its HTF7350, the latest engine to join its successfu>[...]

Airborne 05.21.13: Cirrus Chute Fails, NASA Record, More NIMBY Nonsense

Also: PC-12 Record, Maule Nation, Cockpit Lockout, 34,000 Airliners Needed, Beechcraft Wins Big Contract You know you're having a bad day when a flight goes so bad that you feel yo>[...]

Helo Crew Missing From Vietnam War Accounted For, Interred At Arlington

Four Buried As A Group May 2 A Navy Pilot, missing from the Vietnam War, has been accounted-for and was buried with full military honors along with his crew. According to the Depar>[...]

ANN's Daily Aero-Linx (05.21.13)

Forest Service Smoke Jumpers Smokejumping was first proposed in 1934 by T.V. Pearson, the Forest Service Intermountain Regional Forester, as a means to quickly provide initial atta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC