NGC Passes Key Design Review For B-2 Weapons Management Upgrade Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, May 31, 2015

NGC Passes Key Design Review For B-2 Weapons Management Upgrade Program

Air Force Approves Development Of New Software And Hardware

Northrop Grumman Corporation has successfully demonstrated to the U.S. Air Force that its plans to upgrade key weapons management software for the B-2 stealth bomber are on track and ready to proceed to the next level of development.

The company successfully completed the critical design review (CDR) of the service's Flexible Strike Phase 1 program on Feb 3.  Air Force approval of the CDR authorizes Northrop Grumman to begin development and integration of the new software and hardware required for the upgrade.

Northrop Grumman is the Air Force's prime contractor for the B-2, one of the most powerful and survivable long range strike systems in the world.

"The Flexible Strike software upgrade lays the foundation for future system enhancements, including the ability to carry multiple weapon types," said Col. Robert Strasser, U.S. Air Force, B-2 system program manager and chief of the B-2 division of the Air Force's Fighters and Bombers Directorate. "This 'mixed loads' capability will ensure maximum strategic nuclear and conventional strike capability."

CDR is a key review point in a three-year, $102 million contract awarded to Northrop Grumman in Aug. 2014.  The contract covers the engineering and manufacturing development (EMD) portion of the Flexible Strike Phase 1 program.

"The Flexible Strike software upgrade program will give the B-2 a simpler, more powerful way to manage communications with its weapon systems," said Dave Mazur, vice president and B-2 program manager, Northrop Grumman Aerospace Systems.  "It will also reduce B-2 maintenance costs, increase mission flexibility and increase aircraft reliability."

The B-2 currently uses software called an operational flight program (OFP) to manage the communication between the jet and the hardware that holds and dispenses its weapons. Under its EMD contract, Northrop Grumman is replacing several mission-specific OFPs with a single OFP that can manage all of the B-2's weapons carriage devices.

(Image from file)

FMI: www.northropgrumman.com/B-2

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC