HH-60W Enters Soundproof Chamber For Defense Systems Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Mon, Jan 13, 2020

HH-60W Enters Soundproof Chamber For Defense Systems Testing

Test Data Will Be Used To Support Specification Compliance And Check For Defensive System Discrepancies Or Concerns

The Air Force’s newest combat rescue helicopter was suspended in a soundproof chamber at the Joint Preflight Integration of Munitions and Electronic Systems facility in mid-November for defense system testing. The 413th Flight Test Squadron’s HH-60W spent approximately seven weeks testing the defensive systems upgrades from the legacy HH-60G currently flown by Air Combat Command.

The J-PRIMES facility has the unique capability to capture high quality data on defensive systems by isolating the electromagnetic radiation inside the facility’s anechoic chamber. The chamber is a room designed to stop reflections of sound or electromagnetic waves and is insulated from external noise.

Testing the HH-60W in J-PRIMES will characterize the performance of the helicopter’s systems before electronic warfare flight-testing. The tests ensure it is capable of defeating hostile threats while performing its designated combat search and rescue mission.

The new aircraft arrived at the 96th Test Wing in early November. The Air Force is contracted to purchase 113 HH-60W aircraft to replace its aging fleet of HH-60G helicopters. The J-PRIMES facility hosts similar test missions throughout the year. The facility provides an environment to facilitate testing air-to-air and air-to-surface munitions and electronics systems on full-scale aircraft and land vehicles before open air testing.

The J-PRIMES test data will be used to support specification compliance and check for defensive system discrepancies or concerns.

This is an early, but critical step in the developmental process of the new HH-60W. After J-PRIMES testing, this particular aircraft will begin flight test for its defensive systems. “Developmental test has begun in earnest,” said Joe Whiteaker, the squadron’s combat rescue helicopter flight commander. “Every new event brings us closer to getting this aircraft to the warfighter, which is what we are really focused on.”

(Image provided with USAF news release)

FMI: www.af.mil

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC