Discovery Arrives At Launch Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, May 04, 2008

Discovery Arrives At Launch Pad

STS-124 Targeted For May 31 Launch

After safely reaching its launch pad at NASA's Kennedy Space Center, the space shuttle Discovery now awaits its next major milestone for the upcoming STS-124 mission. A launch dress rehearsal, known as the terminal countdown demonstration test, is scheduled to take place at Kennedy from May 6 to 9.

Discovery arrived at the pad at 0425 EDT Saturday on top of the giant crawler-transporter. The massive moving platform left Kennedy's Vehicle Assembly Building at 2347 EDT Friday, traveling less than 1 mph during the 3.4-mile journey. The shuttle was secured on the launch pad at 0606 EDT Saturday.

NASA aims to launch Discovery May 31 on a 13-day mission to the International Space Station. The shuttle's seven crew members will deliver the Kibo laboratory's large Japanese Pressurized Module, or JPM, and its remote manipulator system to the International Space Station. Three spacewalks will be conducted during the flight.

Mark Kelly will command the STS-124 mission. Ken Ham will be the pilot. The mission specialists are Karen Nyberg, Ron Garan, Mike Fossum, Greg Chamitoff and Japan Aerospace Exploration Agency astronaut Akihiko Hoshide.

Chamitoff will remain on the station as a resident crew member, replacing station Flight Engineer Garrett Reisman, who will return home on Discovery.

The STS-124 astronauts and ground crews will participate in the practice countdown. The terminal countdown demonstration test provides each shuttle crew with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training.

STS-124 is the 123rd shuttle flight, the 35th flight for Discovery and the 26th flight to the station.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC