Embraer To Expand Business Jet Operations In Melbourne, FL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 31, 2013

Embraer To Expand Business Jet Operations In Melbourne, FL

Will Add Assembly Line For Legacy Business Jet Line

At a ceremony that included Florida Governor Rick Scott, Embraer announced that it will expand its current Melbourne, FL facilities with the addition of a new aircraft assembly line for the Legacy 500/450 twin-engine business jets. The expansion is subject to approval by the appropriate authorities.

The company’s campus at Melbourne International Airport currently includes an assembly plant and paint facility for Phenom 100/300 business jets, as well as Embraer’s worldwide customer center for executive aircraft.  As previously announced, the company is also constructing an Engineering and Technology Center, currently operating at a temporary facility at the Melbourne airport, which will become part of Embraer’s Melbourne campus in 2014.

Embraer President and Chief Executive Officer Frederico Fleury Curado said, “Some 50 percent of our executive jet deliveries go to the U.S. and more than 60 percent of the aircraft content comes from U.S. suppliers and industrial partners, so this is a natural step forward to the benefit of our customers.”

The Legacy 500 is the first midsize business jet incorporating a fly-by-wire control system and full six-foot, stand-up cabin with a flat floor. It has the largest cabin in its class and provides the comfort and incorporates the technology found only in larger, more expensive aircraft. The Legacy 500 will enter service in the first half of 2014, followed by the Legacy 450 one year later.

Construction of the new facility will commence in 2014, and the first Legacy 500 to be delivered from the facility is scheduled for 2016.

(Legacy 500 image provided by Embraer)

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC