AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Feb 26, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-03-07

PRODUCT: Certain Boeing Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-16-05, which applied to the airplanes listed above.

AD 2017-16-05 required a one-time detailed visual inspection for discrepancies in the Krueger flap bullnose attachment hardware, and related investigative and corrective actions if necessary.

This AD adds airplanes and an additional inspection to determine if any Krueger flap no. 1, 2, 3, or 4 has been replaced, and related investigative and corrective actions. Since this is a rotable parts issue, the applicability of this AD has been expanded beyond the airplanes listed in the related service bulletin to include all airplanes on which a Krueger flap bullnose may be installed.

This AD was prompted by a report of a Krueger flap bullnose departing an airplane during taxi, which caused damage to the wing structure and thrust reverser, and a report of a missing no. 2 Krueger flap bullnose hinge bolt from an airplane that was not included in the effectivity of AD 2017-16-05.

DATES: This AD is effective March 29, 2019.

COST: The FAA estimates that this AD affects 1,814 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspection of the Krueger flap bullnose hardware (retained actions from AD 2017-16-05) 3 work-hours × $85 per hour = $255 per airplane.
  • Inspection to determine if any Krueger flap no. 1, 2, 3, or 4 has been replaced (1,814 airplanes) (new action) 3 work-hours × $85 per hour = $255 per airplane.
  • FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC