Aero-News: Quote of the Day (09.08.20) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned-
Alt. Wednesdays

Airborne Flight Training-Alt. Wednesdays

Airborne Unlimited-
Friday

Airborne Special Programs!
Airborne-YouTube  Airborne Unlimited--09.21.20 Airborne-Unmanned--09.16.20   Airborne-Flight Training--09.23.20 Airborne Unlimited--09.18.20  The 2020 Avionics Innovation Preview!

Airborne On ANN

Airborne Unlimited--09.21.20

Airborne-Unmanned--09.16.20

Airborne-Flight Training--09.23.20

Airborne Unlimited--09.18.20

Airborne's Annual April 1st Episode

Mon, Sep 14, 2020

Aero-News: Quote of the Day (09.08.20)

Aero-News: Quote of the Day

ANN's Quote of the Day usually derives from current news, though we reserve the right to pick quotes out of history that have a bearing on the day's events and issues.

Sometimes, you'll find them timely and in keeping with the content of the day's news... and sometimes, they'll just be thought-provoking.

Reader suggestions and comments are welcome... and if particularly intriguing, timely, or poignant, may themselves become future Quotes of the Day.

Let us hear from you, folks!

Aero-News Quote of the Day

"This was our first orbital launch attempt, and the first flight of a rocket designed from the ground-up for low cost mass production and highly-automated launch operations. The entire launch system was deployed by six people in less than a week – completely unprecedented. Astra’s strategy is to learn fast through iterative development. Although we’re pleased with today’s outcome, we still have more work to do to reach orbit. Once we reach orbit, we will relentlessly continue to improve the economics of the system as we deliver our customers’ payloads. Over the next several weeks, we’ll be taking a close look at the flight data to determine how to make the next flight more successful. Rocket 3.2 is already built and ready for another big step towards orbit. Thank you to our incredible team and their families, all of our supporters, and stay tuned for updates over the next few weeks. We’ll be back to the pad before you know it!"

Source: From a blog entry by Astra, outlining their ongoing development strategy.

FMI: www.astra.com, https://twitter.com/i/status/1304626860853141505

Advertisement

More News

Flightsafety Now Trains On The Gulfstream G280 Wilmington, DE

The Wilmington Learning Center Is Flightsafety's Third Gulfstream G280 Training Location FlightSafety International now offers training for the Gulfstream G280 aircraft at its Lear>[...]

Aero-News: Quote of the Day (09.25.20)

"Gripen's arrival in Brazil and its first flight are major milestones in the Brazilian Gripen programme. We are proud of this journey alongside so many qualified and committed prof>[...]

Power, Pulchritude and Performance: Flight Testing Pipistrel's Panthera, Part 1

By Jim Campbell, ANN CEO/Editor-n-Chief/Test Pilot (Arrogant, Over-Opinionated Know-It-All/Test Dummy) ANN E-I-C Note: It’s been a while since I had the chance to sit down an>[...]

ANN's Daily Aero-Linx (09.22.20)

Aero Linx: The Light Aircraft Association Welcome to the Light Aircraft Association, the heart of a community that lives and breathes recreational aviation in all its forms! With a>[...]

ANN's Daily Aero-Term (09.22.20): Arresting System

Arresting System A safety device consisting of two major components, namely, engaging or catching devices and energy absorption devices for the purpose of arresting both tailhook a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC