Sierra Nevada Corp. Plans Dream Chaser Flights Later This Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.02.16

Airborne 04.26.16

AEA2016 LIVE!!! 0830-1230ET

AEA2016 LIVE!!! 1400-1700ET

AEA2016 LIVE!!! 1100-1400ET

Airborne Hi-Def On YouTube

Airborne 05.02.16

Airborne 04.26.16

AEA2016 LIVE!!! 0830-1230ET

AEA2016 LIVE!!! 1400-1700ET

AEA2016 LIVE!!! 1100-1400ET

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Tue, Apr 22, 2014

Sierra Nevada Corp. Plans Dream Chaser Flights Later This Year

Dream Chaser, Boeing, And SpaceX Face NASA Evaluation In August

Sierra Nevada Corp. co-program director John Currie is reported to have said that the company will conduct additional drop tests of their Dream Chaser spacecraft at California’s Edwards Air Force Base in the fall of this year.

According to an article published on the Parabolic Arc website, this will be an upgraded version of the vehicle used in the landing tests last year. The upgraded software, guidance, avionics, navigation, and control systems used on this test vehicle are the same as planned for the dream chaser orbital flight.

However, despite the planned test by the Sierra Nevada Corp., this is a competition and they are completing against the Boeing Company and SpaceX. As the Sierra Nevada Corp. is moving forward, it is still 17 months behind its originally planned schedule. Boeing has also seen their schedule slip.

The article reports that NASA said it hopes to award the next round of contracts in August which means key criteria must be met by that time for competing companies. NASA has already amended the agreements and extended the current testing round from the April-May time frame to August.

In October of last year the dream chaser was dropped from a helicopter and glided to a landing. While the flight parameters went as planned, its left landing gear failed to properly deploy resulting in damage to the spacecraft. This flight was performed by automated systems; no crew was on board. Despite the landing accident, NASA accepted the flight as a milestone for the Sierra Nevada Corp., and they received a $7 million milestone payment from NASA.

The competition goes on and private companies come closer to providing NASA with manned low orbit spaceflight.

(Dream Chaser pictured in file photos)

FMI: www.sncorp.com

Advertisement

More News

Aero-News: Quote Of The Day (05.02.16)

“The past months were amazing for ARCA Space Corporation, as the ArcaBoard was prepared for production. We couldn’t be happier knowing how fortunate we are to create an>[...]

Delta Orders Additional Airbus A321 Jets

Order For 37 More A321s Brings The Total Order Book To 82 Of The Large Narrowbody Aircraft Delta Air Lines has reached an agreement with Airbus to acquire 37 additional A321s as pa>[...]

Klyde Morris (05.02.16)

Klyde: The More Things Change, The More They Stay The Same! FMI: www.klydemorris.com>[...]

FAA Small UAS Rules Getting Closer

Proposed Regulations For Small UAS Operation Have Been Forwarded To The OMB For A Final Look After waiting for an extended time, the FAA has finally forwarded its proposed regulati>[...]

Airborne 04.26.16: Drone v Airplane-NOT!, eFusion Electric Plane, ANN@AEA-LIVE!!

Also: MU-2 AOA, AMA Responds To Senate FAA Reauthorization, ANN@AEA Live 04/27-0830ET, ANN@AEA Live 04/28-1400ET, ANN@AEA Live 04/29-1100ET A report of a drone possibly colliding w>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC