Sierra Nevada Corp. Plans Dream Chaser Flights Later This Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 01.15.18

Airborne-UnManned 01.16.18

Airborne 01.17.18

AMA Drone Report 01.18.18

Airborne 01.19.18

Airborne-YouTube

Airborne 01.15.18

Airborne-UnManned 01.16.18

Airborne 01.17.18

AMA Drone Report 01.18.18

Airborne 01.19.18

Tue, Apr 22, 2014

Sierra Nevada Corp. Plans Dream Chaser Flights Later This Year

Dream Chaser, Boeing, And SpaceX Face NASA Evaluation In August

Sierra Nevada Corp. co-program director John Currie is reported to have said that the company will conduct additional drop tests of their Dream Chaser spacecraft at California’s Edwards Air Force Base in the fall of this year.

According to an article published on the Parabolic Arc website, this will be an upgraded version of the vehicle used in the landing tests last year. The upgraded software, guidance, avionics, navigation, and control systems used on this test vehicle are the same as planned for the dream chaser orbital flight.

However, despite the planned test by the Sierra Nevada Corp., this is a competition and they are completing against the Boeing Company and SpaceX. As the Sierra Nevada Corp. is moving forward, it is still 17 months behind its originally planned schedule. Boeing has also seen their schedule slip.

The article reports that NASA said it hopes to award the next round of contracts in August which means key criteria must be met by that time for competing companies. NASA has already amended the agreements and extended the current testing round from the April-May time frame to August.

In October of last year the dream chaser was dropped from a helicopter and glided to a landing. While the flight parameters went as planned, its left landing gear failed to properly deploy resulting in damage to the spacecraft. This flight was performed by automated systems; no crew was on board. Despite the landing accident, NASA accepted the flight as a milestone for the Sierra Nevada Corp., and they received a $7 million milestone payment from NASA.

The competition goes on and private companies come closer to providing NASA with manned low orbit spaceflight.

(Dream Chaser pictured in file photos)

FMI: www.sncorp.com

Advertisement

More News

Airborne-Unmanned 01.16.18: AUVSI Trusted Operator, Typhoon H Plus, Intel

Also: Drones Tracking Illegal Dumping, Arctic UAS, Airspace Situational Awareness, TrueView R20 AUVSI has announced the appointment of leading industry stakeholders to serve on a s>[...]

Airborne 01.19.18: Airbus A380 Reprieve, FAA Sued, FAA Defends Drop Zone

Also: Skydiving Museum, Nature Air Suspended, IAC 2017 Collegiate Program, StandardAero Ceases LAX Ops You can hear the sigh of relief from across the Atlantic... After several mon>[...]

AMA Drone Report 01.18.18: 1 Million Drone Reg's, Autel EVO, FAA Sued Again

Also: New DJI Mavic?, SureFly Not Yet, Drones Tracking Illegal Dumping, 'Illicit' Drone Video The FAA has registered a million drones, the DOT announced last week at CES in Las Veg>[...]

Aero-News: Quote of the Day (01.21.18)

“Being in structural maintenance kind of centers around building parts for the aircraft. I took a personal interest in the project because it’s not something we normall>[...]

ANN's Daily Aero-Term (01.21.18): Obstacle Departure Procedure (ODP)

Obstacle Departure Procedure (ODP) A preplanned instrument flight rule (IFR) departure procedure printed for pilot use in textual or graphic form to provide obstruction clearance v>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC