House Armed Services Committee Member Asks For F-35 Operational Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, May 11, 2012

House Armed Services Committee Member Asks For F-35 Operational Date

Attempted To Tie Some Funding To The Announcement Of A Date Certain

A Republican member of the House Armed Services Committee was thwarted on Wednesday in an attempt to tie funding for the F-35 JSF to a guaranteed operational date from the Defense Department.

Representative Todd Akin (R-MO) (pictured) offered an amendment to an appropriations bill during a markup session in the HASC. His amendment would have withheld half of the procurement funds if the Pentagon did not give Congress a firm operational date for the JSF by March of 2013.

The amendment was opposed by every other member of the committee. The Hill reports that Akin said it was one that members had been told to vote against the measure, though he did not say who had made that suggestion. "“In the markup yesterday (Wednesday) I offered a number of amendments to ensure that we are getting the squeal out of our nickels in the Defense Department. The F-35 program is the most expensive program in DOD history and has repeatedly faced cost overruns and broken schedules. I offered an amendment to hold the program accountable and demand transparency. Unfortunately, the committee significantly watered down my amendment," he said in a news release.

Instead, members backed a substitute offered by Washington State Democrat Adam Smith, who said withholding procurement funding would send a bad message to foreign governments who are partners on the $1.5 trillion program. Some have said they will pull their support if design and other problems persist with the Lightning II.

Akin was the only "no" vote on the Smith substitute.

FMI: http://armedservices.house.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC