Maxar Teams With Dynetics On Components For Lunar Gateway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jul 15, 2019

Maxar Teams With Dynetics On Components For Lunar Gateway

Will Leverage The Commercial Capabilities Of Huntsville, Alabama-Based Company For Its Power And Propulsion Element Spacecraft

Maxar Technologies has signed a teaming agreement with Huntsville, Alabama-based Dynetics to support Maxar in building and demonstrating the power and propulsion element for the Gateway − an essential component of NASA’s Artemis lunar exploration program and future expeditions to Mars. The teaming agreement establishes a framework for the companies to work together on the mission, with substantive work being executed by Dynetics in Huntsville, Alabama.

Maxar was selected by NASA to build and perform a spaceflight demonstration of the power and propulsion element spacecraft. The spacecraft is the first element for the NASA-led lunar Gateway, which will play a critical role in ensuring that NASA astronauts can land on the surface of the Moon by 2024 while serving as a vital platform to support future missions to Mars and beyond. The mission is targeted for launch by the end of 2022 and will provide power, maneuvering, attitude control, communications systems and initial docking capabilities for the Gateway.

The agreement enables Dynetics to collaborate with Maxar in the design, manufacturing and operations of Maxar’s power and propulsion element spacecraft. Dynetics has a wide range of capabilities to support Maxar in areas such as propulsion systems, mechanical and propulsion testing, system integration and assembly, and mission operations.

“We’re thrilled to add Dynetics to our team and bring power and propulsion element work to Huntsville. Dynetics has decades of expertise in human space exploration, and will play a critical role in executing the Artemis mission, landing the first woman on the surface of the Moon, and establishing the sustainable space infrastructure that is necessary to explore Mars,” said Mike Gold, Maxar’s Vice President of Civil Space.

“This is an exciting time for lunar exploration. We look for space partners that share our similar core values and are eager to see America return to the Moon. Maxar fills that role and Dynetics is glad to be on the team. Maxar’s power and propulsion element will be a vital element of the lunar Gateway and will aid establishment of a sustainable presence on the Moon. We are looking forward to this partnership and to participating in the development of the lunar architecture here in Huntsville on our campus and in Decatur, Alabama, at our Aerospace Structures Complex,” said Kim Doering, Dynetics vice president for space systems.

The operations of DigitalGlobe, SSL (Space Systems Loral) and Radiant Solutions were unified under the Maxar brand in February; MDA continues to operate as an independent business unit within the Maxar organization.

(Image provided with Maxar news release)

FMI: www.maxar.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC