AD: General Electric | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 22, 2005

AD: General Electric

AD NUMBER: 2005-06-07
MANUFACTURER: General Electric
SUBJECT: Airworthiness Directive 2005-06-07
SUMMARY: The FAA is superseding an existing airworthiness directive (AD) for GE CF6-80A1/A3 and CF6-80C2A series turbofan engines. That AD currently requires completing one of the following actions before further flight: performing a directional pilot valve (DPV) pressure check for leakage, and, if necessary, replacing the DPV assembly with a serviceable assembly, or replacing the DPV assembly with a serviceable assembly, or deactivating the thrust reverser, and revising the FAA-approved airplane flight manual (AFM) to require applying performance penalties for certain takeoff conditions if a thrust reverser is deactivated. That AD also requires revising the Emergency Procedures Section of the FAA-approved AFM to include a flight crew operational procedure for use in the event of any indication of an in-flight thrust reverser deployment. This AD specifies the same requirements for leak checks, but increases the interval between required checks. This AD also removes the requirement to revise the Limitations Section and the Emergency Procedures Section of the applicable AFM when deactivating one or both thrust reversers. This AD results from Airbus Industrie, the airplane manufacturer, revising the master minimum equipment list (MMEL) to include procedures for operating the airplane with the thrust reversers deactivated, and revising the AFM to include procedures for emergency operation if the thrust reversers deploy while in flight. This AD also results from the engine manufacturer recommending extending the interval between inspecting or replacing the DPV. We are issuing this AD to prevent inadvertent thrust reverser deployment, which, if it occurs in-flight, could result in loss of control of the airplane.

FMI: www.airweb.faa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC