Fully Outfitted Gulfstream G600 Test Aircraft Completes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 31, 2017

Fully Outfitted Gulfstream G600 Test Aircraft Completes First Flight

Becomes The Fifth G600 Aircraft To Fly In Less Than Nine Months

The final aircraft in the Gulfstream G600 flight-test program has flown for the first time. Outfitted with a complete interior, the aircraft serves as a cabin testbed to ensure a superior customer experience. The aircraft is the fifth to join the G600 flight-test program since it began on Dec. 17, 2016.

The G600 took off from Savannah/Hilton Head International Airport at 3:07 p.m. During the 2- hour and 55-minute flight, the aircraft reached an elevation of 51,000 feet/15,545 meters and a speed of Mach 0.85. The aircraft landed back in Savannah at 6:02 p.m. local time.

“The goal of including a production aircraft in our flight-test program is to ensure we deliver the most functional, comfortable and reliable cabin environment for our customers,” said Mark Burns, president, Gulfstream. “Our extensive testing will validate design and performance, so we can provide a cabin that exceeds expectations.”

Gulfstream will conduct repeated operations of all cabin systems to evaluate comfort, layout, noise, ergonomics, functionality, passenger interaction and appliance reliability.

To date, the G600 program’s five test aircraft have accumulated more than 180 flights and 790 flight hours.

“We now have 10 aircraft flying in our concurrent Gulfstream G500 and G600 flight-test programs,” Burns said. “That’s a remarkable achievement for business aviation and a first for the company. It reflects the priority we place on adhering to a long-term strategy, investing in research and development, leveraging our ground-based labs and ensuring consistent and steady progress in aircraft development.”

Gulfstream anticipates receiving FAA type certification for the all-new G600 in 2018. Customer deliveries are scheduled for later that year.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC