NASA Partner SpaceX Completes Review Of 2014 Commercial Crew Abort Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Oct 27, 2013

NASA Partner SpaceX Completes Review Of 2014 Commercial Crew Abort Test

Assesses Software That Would Issue In-Flight Abort Command, SuperDraco Engines, Interface

In preparation for a summer 2014 test, NASA partner Space Exploration Technologies (SpaceX) recently laid out its plan to demonstrate the Dragon spacecraft's ability to carry astronauts to safety in the event of an in-flight emergency. This review of the in-flight abort test plan provided an assessment of the Dragon's SuperDraco engines, the software that would issue the abort command, and the interface between the Dragon spacecraft and the Falcon 9 rocket on which the spacecraft will be launched.

"It's critical to have a launch abort system in which NASA and SpaceX can have confidence," said Phil McAlister, director of Commercial Spaceflight Development at NASA Headquarters in Washington. "When you put humans aboard, safety and reliability are paramount and this review and the upcoming tests will help prove their space transportation system is on the right track."

Experts from NASA and the Federal Aviation Administration attended the review of the in-flight abort test plan Sept. 17 at SpaceX headquarters in Hawthorne, Calif. Attendees also had the opportunity to view the Dragon test spacecraft, which is being manufactured for an upcoming pad abort test and, potentially, the in-flight abort test. "With NASA’s support, SpaceX continues to implement the necessary modifications to equip Dragon to fly crew," said Garrett Reisman, commercial crew project manager at SpaceX. "SpaceX and NASA believe in rigorous flight testing and we are looking forward to putting our SuperDraco launch abort system through these critical tests, starting with the pad abort test in the spring and followed by the in-flight abort test in the summer."

The in-flight abort test will take place along Florida’s space coast. During the test, a Dragon spacecraft will launch on a standard Falcon 9 rocket and an abort command will be issued approximately 73 seconds into the flight. At that point, the spacecraft will be flying through the area of maximum dynamic pressure, or Max Q, where the combination of air pressure and speed will cause maximal strain on the spacecraft.

Dragon will be outfitted with about 270 special sensors to measure a wide variety of stresses and acceleration effects on the spacecraft. An instrumented mannequin, similar to a crash test dummy, also will be inside. The spacecraft's parachutes will deploy for a splashdown in the Atlantic, where a ship will be pre-positioned for simulated rescue operations. The test spacecraft will be returned to Port Canaveral by barge so data can be retrieved and incorporated into the system's design.

(Pictured: The SpaceX Dragon commercial cargo craft, as it is about to be grappled by the Canadarm2 robotic arm at the International Space Station in May 2012. NASA image)

FMI: www.nasa.gov/commercialcrew

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC