Testing To Begin In Tyler, TX For First Responder Drone Network | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Wed, Nov 07, 2018

Testing To Begin In Tyler, TX For First Responder Drone Network

City Council Approves Flight Testing At October 24 Meeting

What if all first responders had a way to see what is happening at a fire, accident or disaster BEFORE they arrive, or even before they leave the station? FIRST iZ is a patent pending system to allow a drone to be dispatched by 911 operators using the Genesis PULSE software. The drone can autonomously fly from locations, such as fire stations, up to five miles to incidents to give ‘eyes’ on the scene. As soon as first responders arrive on a scene, FIRST iZ will be told to return home, charge, and await the next mission.

The Tyler City Council approved an agreement on October 24 with Tyler company Phirst Technologies, LLC to allow a drone and a port to be located in a secure enclosure at Fire Station #9 for the purpose of early testing of the drone and port for first responder use. Testing will be done within FAA part 107 rules for drones and last six to ten months. All information and data generated during this test will be the property of Phirst Technologies, LLC to allow improvement through learning. Phirst Technologies, LLC is bearing all costs for the installation and testing.

PTL will test their patent pending features involving a custom drone and a drone port as they prepare for Beta level testing that will begin in 2019. This Alpha Testing phase will be conducted by Falcon Aerial Data, a Tyler based drone company, under their FAA licenses. Alpha testing will be basic take off, landing, and flights within visual line of sight in various weather conditions, in and around Tyler Fire Station #9 located on South Paluxy, near Loop 49. The goal is to learn about flight dynamics of the newly designed drone and the systems that control it, in multiple weather scenarios. We will also test the redundant systems in the drone from batteries to autopilot to the parachute system. There WILL be failure, but it will be with the purpose of learning and moving forward.

Beta level testing will involve 20 to 40 drones and ports that will be placed at various locations in the USA. The goal of that testing is to make sure that all components are ready for ‘go to market’ late in 2019. The testing scenarios will be more complex and involve cities and counties at a higher level. It is expected that actual use for actual incidents will happen each week during the Beta phase. PTL expects to go to market in late 2019 and ramp up production in 2020 for nationwide distribution. The plan is to offer the drone networks to cities, counties, emergency districts, large campuses, forest services and other locations where disasters occur. The plan is to lease the network of hardware with complete service and oversight, rather than an outright sale to a city.

(Source: First iZ news release. Tyler City Council meeting image provided)

FMI: FIRSTiZ.co, xCraft.io, www.FalconAerialData.com

Advertisement

More News

NTSB Final Report: Dehavilland DHC-2 MK 1

During The Forced Landing, The Airplane’s Float Struts And Spreaderbars Collapsed Analysis: While en route to a remote fishing lodge in a float-equipped airplane, one of the >[...]

Aero-News: Quote of the Day (10.29.25)

"X-59 is a symbol of American ingenuity. The American spirit knows no bounds. It's part of our DNA – the desire to go farther, faster, and even quieter than anyone has ever g>[...]

ANN's Daily Aero-Linx (10.29.25)

Aero Linx: The Honourable Company of Air Pilots The advancement of the public interest by the promotion of safety for all those who are employed in connection with or who travel by>[...]

ANN's Daily Aero-Term (10.30.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (10.30.25)

Aero Linx: Aerospace Industries Association (AIA) For over 100 years, the American aerospace and defense industry has shaped the world around us. From the first flight to the moon >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC